Induction Sealing Machine – OQ Protocol

Document Control

Version: 1.0

Effective Date: [Insert Date]

Reviewed By: [Insert Reviewer Name]

Approved By: [Insert Approver Name]

Operational Qualification Protocol for Induction Sealing Machine

Objective: To validate the operational performance of the Induction Sealing Machine used for sealing liners in solid dosage form packaging, ensuring compliance with the acceptance criteria as referenced in URS Annex11.

Scope: This protocol applies to the Induction Sealing Machine located in the Packaging/Primary area and is intended for use in the sealing of liners for pharmaceutical products.

Responsibilities:

  • Validation Team: Execute the OQ protocol and document the results.
  • Quality Assurance: Review and approve the OQ protocol and results.
  • Operations: Provide access to the equipment and assist in the execution of the protocol.

Prerequisites:

  • Completion of Installation Qualification (IQ).
  • Training of personnel on the operation of the Induction Sealing Machine.

Equipment Description:

The Induction Sealing Machine is designed to seal liners in solid dosage forms, ensuring the integrity and safety of the product. The critical parameters for this machine include power conveyor speed and seal integrity.

Test ID Procedure Acceptance Criteria Evidence
OQ-001 Verify power conveyor speed at various settings. Speed must be within specified limits as per URS Annex11. Calibration log and speed measurement records.
OQ-002 Conduct seal integrity tests on sealed products. Seals must pass integrity tests without failure. Test results and inspection reports.
See also  Inline Sifter (Transfer Line) – Qualification Certificate Template

Detailed Test Cases:

  • Test Case OQ-001: Measure the power conveyor speed using a calibrated tachometer. Record the speed at 3 different settings (low, medium, high) and ensure it meets the URS Annex11 specifications.
  • Test Case OQ-002: Perform seal integrity tests using a seal tester. Assess a minimum of 10 samples per batch, ensuring all samples pass the integrity test.

Deviations:

Any deviations from the acceptance criteria must be documented and investigated. A root cause analysis will be conducted, and appropriate corrective actions will be implemented.

Approvals:

All results and findings must be reviewed and approved by the Quality Assurance team before the conclusion of the OQ protocol.

Data Integrity Checks:

  • Ensure all data recorded during testing is captured in a validated electronic system.
  • Implement audit trails for all data entries related to the OQ protocol.
  • Conduct periodic reviews of data integrity compliance.