Suppository Base Melting Vessel (Jacketed SS) – OQ Protocol

Document Number: OQ-001

Version: 1.0

Effective Date: [Insert Date]

Prepared by: [Your Name]

Approved by: [Approver’s Name]

Operational Qualification Protocol for Suppository Base Melting Vessel

Objective: To validate the operational performance of the Suppository Base Melting Vessel (Jacketed SS) to ensure it meets specified requirements for melting PEG for suppository production.

Scope: This protocol applies to the operational qualification of the Suppository Base Melting Vessel used in the Production area for the melting of PEG, ensuring compliance with industry standards and product impact requirements.

Responsibilities:

  • Validation Team: Execute the OQ protocol and document results.
  • Quality Assurance: Review and approve the OQ documentation.
  • Production Personnel: Assist in the execution of the protocol.

Prerequisites:

  • Completion of Installation Qualification (IQ).
  • Availability of necessary equipment and materials.
  • Training of personnel on equipment operation.

Equipment Description:

The Suppository Base Melting Vessel (Jacketed SS) is designed to melt PEG for suppository production. It features a stainless steel jacket for controlled heating and is equipped with temperature control mechanisms to ensure uniform melting.

Test ID Procedure Acceptance Evidence
OQ-01 Verify temperature calibration ±2°C of set point Calibration certificate
OQ-02 Check operational controls All controls functional Test report
OQ-03 Perform melting test with PEG Complete melting within 30 minutes Melting time log

Test Cases:

  1. Test ID: OQ-01

    Procedure: Verify the calibration of the temperature gauge against a certified thermometer.

    Acceptance Criteria: The temperature should be within ±2°C of the set point.

    Evidence: Calibration certificate must be maintained in the validation file.

  2. Test ID: OQ-02

    Procedure: Check all operational controls for functionality.

    Acceptance Criteria: All controls must operate without error.

    Evidence: A detailed test report documenting the results.

  3. Test ID: OQ-03

    Procedure: Conduct a melting test using PEG, recording the time taken for complete melting.

    Acceptance Criteria: The melting process should be completed within 30 minutes.

    Evidence: Melting time log to be included in the final report.

See also  Jet Mill / Micronizer – Qualification Certificate Template

Deviations:

Any deviations from the acceptance criteria must be documented in the deviation log and approved by the Quality Assurance team.

Approvals:

__________________________
Validation Team Lead

__________________________
Quality Assurance Manager

Data Integrity Checks:

  • Ensure that all data logs are electronically signed and time-stamped.
  • Perform regular backups of the temperature control data.
  • Review data entries for accuracy and completeness.