Sterile Powder Compounding Vessel (Jacketed SS) – DQ Protocol

Document Control

Document Number: DQ-001

Version: 1.0

Effective Date: [Insert Date]

Reviewed By: [Insert Name]

Approval Date: [Insert Date]

Design Qualification Protocol for Sterile Powder Compounding Vessel

Objective: To establish and document the design qualification of the Sterile Powder Compounding Vessel (Jacketed SS) used in the preparation of sterile bulk solutions prior to lyophilization.

Scope: This protocol applies to the validation of the Sterile Powder Compounding Vessel located in the Production Area, ensuring compliance with regulatory requirements and internal standards.

Responsibilities:

  • Validation Team: Execute and document the qualification activities.
  • Quality Assurance: Review and approve the protocol and results.
  • Production Team: Provide operational input and support during qualification.

Prerequisites:

  • Completion of User Requirement Specification (URS).
  • Installation Qualification (IQ) must be completed prior to DQ.
  • Availability of relevant Standard Operating Procedures (SOPs).

Equipment Description:

The Sterile Powder Compounding Vessel (Jacketed SS) is designed for the preparation of sterile bulk solutions. It features a jacket for temperature control and is equipped with a PLC for monitoring and control of critical parameters.

Test ID Procedure Acceptance Evidence
DQ-001-01 Verify agitation speed settings Agitation speed within specified range Calibration records
DQ-001-02 Check temperature control functionality Temperature maintained as per specifications Temperature logs
DQ-001-03 Validate hold time parameters Hold time meets defined criteria Process records
DQ-001-04 Audit PLC for data integrity Audit trail complete and accurate PLC audit report
See also  Sachets & Stick Packs (Non-Sterile) – OQ Protocol

Detailed Test Cases:

  • Test Case 1: Verify that the agitation speed can be set and maintained within the specified range. Record actual speeds during operation.
  • Test Case 2: Monitor the temperature during operation to ensure it remains within acceptable limits. Document any deviations.
  • Test Case 3: Confirm that the hold time is properly initiated and maintained. Compare against established criteria.
  • Test Case 4: Review the PLC audit trail for completeness, ensuring all critical parameters are logged accurately.

Deviations: Any deviations from the acceptance criteria must be documented and assessed for impact on product quality.

Approvals:

  • Prepared By: [Insert Name]
  • Reviewed By: [Insert Name]
  • Approved By: [Insert Name]

Data Integrity Checks:

  • Regular audits of PLC data to ensure no unauthorized changes.
  • Verification of backup procedures for critical data.
  • Cross-checking of manual logs against PLC data for consistency.