Blow-Fill-Seal (BFS) Machine – PQ Protocol

Document Control:

  • Document Number: PQ-BFS-001
  • Version: 1.0
  • Effective Date: [Insert Date]
  • Reviewed By: [Insert Name]
  • Approval Date: [Insert Date]

Performance Qualification Protocol for Blow-Fill-Seal Machine

Objective: To validate the performance of the Blow-Fill-Seal (BFS) machine to ensure it meets specified requirements for aseptic filling of IV infusions.

Scope: This protocol applies to the Blow-Fill-Seal machine used in the production area for the aseptic filling of large volume parenterals (LVP) and small volume parenterals (SVP) in bags and bottles.

Responsibilities:

  • Validation Team: Execute the protocol and document results.
  • Quality Assurance: Review and approve the protocol and results.
  • Production: Provide necessary access and support during validation.

Prerequisites:

  • Completion of Installation Qualification (IQ) for the BFS machine.
  • Training of personnel on the BFS operation and validation procedures.
  • Availability of necessary materials and equipment for testing.

Equipment Description:

The Blow-Fill-Seal machine is designed for the aseptic production of containers and is critical for maintaining sterility during the filling process. It operates by blowing, filling, and sealing containers in a controlled environment.

Test ID Procedure Acceptance Criteria Evidence
PQ-001 Verify mold temperature during operation. Temperature within specified range as per URS. Temperature logs.
PQ-002 Check fill accuracy for specified volume. Fill accuracy within ±5% of target volume. Weight measurement records.
PQ-003 Evaluate sterile zone airflow alarms functionality. All alarms must trigger correctly within defined limits. Alarm test records.
PQ-004 Audit trail verification for operation logs. Complete and accurate audit trail maintained. Audit trail reports.
See also  Jet Mill / Micronizer – Deviation Impact Assessment

Detailed Test Cases:

Test Case 1: Mold Temperature Verification

Procedure: Monitor the mold temperature during the filling process using calibrated thermocouples. Record the temperature at regular intervals.

Acceptance: The temperature must remain within the specified range of [Insert Range].

Evidence: Temperature logs will be reviewed for compliance.

Test Case 2: Fill Accuracy Assessment

Procedure: Conduct fill accuracy tests by weighing filled containers. Compare the weight against the target volume.

Acceptance: Fill accuracy must be within ±5% of the target volume.

Evidence: Weight measurement records will be maintained and analyzed.

Test Case 3: Airflow Alarm Functionality

Procedure: Simulate airflow disruptions and verify that alarms activate as expected.

Acceptance: All alarms must trigger correctly when airflow deviates from set parameters.

Evidence: Alarm test records will be documented.

Test Case 4: Audit Trail Verification

Procedure: Review the audit trail generated by the BFS machine for completeness and accuracy.

Acceptance: The audit trail must show all operations without gaps or errors.

Evidence: Audit trail reports will be submitted for review.

Deviations:

Any deviations from the acceptance criteria must be documented and investigated. A root cause analysis will be performed, and corrective actions will be implemented as necessary.

Approvals:

This protocol must be approved by the following personnel:

  • Validation Manager: ____________________ Date: ___________
  • Quality Assurance Manager: ______________ Date: ___________
  • Production Manager: ____________________ Date: ___________