Validating Compressed Air Systems in Pharma Manufacturing



Validating Compressed Air Systems in Pharma Manufacturing

Published on 07/12/2025

Validating Compressed Air Systems in Pharma Manufacturing

This article provides a comprehensive, step-by-step tutorial on the validation of compressed air systems utilized in pharmaceutical manufacturing. It outlines the validation lifecycle, including process design, qualification, performance qualification (PPQ), continued process verification (CPV), and revalidation, while ensuring FDA and EMA compliance. The focus is on meeting the regulatory expectations of US, UK, and EU agencies. The primary keyword addressed is iso 17665.

Step 1: User Requirement Specification (URS) and Risk Assessment

The initial step in the validation of compressed air systems is to create a detailed User Requirement Specification (URS). The URS should clearly define the intended use of the compressed air system concerning the manufacturing process. This document serves as a guiding tool to capture the essential needs of all stakeholders, including engineering, production, quality assurance, and regulatory affairs teams.

In crafting the URS, it is essential to consider the following components:

  • Functional Requirements: Specify functionalities such as pressure, temperature, and dew point that must be maintained to ensure product quality.
  • Regulatory Compliance: Include
relevant regulations and standards that the compressed air system shall comply with, such as ISO 17665 for steam sterilization and sterility assurance.
  • Risk Assessment: Conduct a risk assessment utilizing tools such as Failure Mode and Effects Analysis (FMEA) to identify potential points of failure and their impact on product quality.
  • The risk assessment should be documented thoroughly, outlining identified risks, mitigation strategies, and responsible parties. Additionally, this information will support future validation activities, as it can be referenced throughout the validation lifecycle.

    Step 2: Protocol Design for Qualification

    The next step focuses on the design of the qualification protocols, which include Installation Qualification (IQ), Operational Qualification (OQ), and Performance Qualification (PQ). These protocols are crucial for verifying that the compressed air system operates correctly and consistently within predefined specifications.

    For the Installation Qualification (IQ), ensure the following aspects are adequately covered:

    • Equipment List: Document all components of the compressed air system, including compressors, drying systems, storage tanks, and distribution networks.
    • Installation Documentation: Verify that equipment installation is completed per manufacturer guidelines and that all relevant documentation (e.g., manufacturer’s certificates, installation checks) is collected and retained.
    • Safety and Compliance: Confirm appropriate safety measures are in place to meet health and regulatory compliance. This includes checks against applicable standards such as ISO 14644-3, which addresses cleanliness and contamination.

    In the Operational Qualification (OQ) phase, develop test cases to assess whether the system achieves its operational parameters:

    • Pressure Testing: Conduct pressure tests to validate that the system can maintain specified pressure levels during operation.
    • Dew Point Measurement: Measure dew points to verify compliance with moisture limits, critical for preventing product contamination.
    • Functional Testing: Execute tests that simulate operational scenarios to ensure the system performs reliably under stipulated conditions.

    Finally, for Performance Qualification (PQ), formalize a regime for real-time use of the compressed air system over an extended period. This involves:

    • Long-Term Monitoring: Establish a monitoring program that continuously checks parameters critical to the system’s operation.
    • Data Collection: Collect data throughout the qualification period to demonstrate consistency and reliability. This data must be analyzed and documented.

    Step 3: Sampling Plans and Statistical Criteria

    To ensure consistent product quality, establishing robust sampling plans and statistical criteria is vital during the validation process of compressed air systems. This involves determining how samples will be collected, the frequency of sampling, and the statistical methods used for evaluation.

    The sampling plan should include the following considerations:

    • Sample Size: Define an adequate sample size that ensures statistical relevance. A balance must be maintained between practicality and sufficient statistical validity.
    • Sampling Frequency: Establish when samples should be gathered. For continuous systems, samples may need to be taken at regular intervals, while batch processes may focus on specific production runs.
    • Location of Sampling: Identify optimal locations for sampling within the compressed air system to capture representative data. Consider conducting samples at critical points in the process, as well as at the entry and exit points of the system.

    Statistical criteria must also be outlined to evaluate the results from the sampling activities effectively. These criteria should include:

    • Acceptance Criteria: Define clear acceptance criteria based on regulations and established performance metrics. This includes permissible limits for contamination levels.
    • Statistical Analysis: Utilize statistical analysis methods such as control charts or hypothesis testing to analyze the collected data. Ensure the selection of appropriate statistical tools that align with the expected outcomes and regulatory standards.

    Documentation of the sampling plan and statistical evaluations is essential. Ensure all protocols are readily available for audits and inspections, thereby facilitating compliance with both FDA and EMA guidelines.

    Step 4: Continued Process Verification (CPV)

    Once the compressed air systems are validated and put into operation, it is paramount to implement a continued process verification (CPV) strategy. CPV is a systematic approach to ensuring that processes are consistently operating within established limits and specifications.

    The CPV framework involves several key components:

    • Monitoring Systems: Develop a monitoring system that regularly tracks critical process parameters and product quality indicators. This includes real-time monitoring of pressure, temperature, and air quality metrics, which should be recorded and reviewed regularly.
    • Data Analysis: Conduct periodic analysis of monitoring data to identify variations or trends. Use statistical tools to assess the stability of the compressed air system over time. The aim is to detect any deviations from established process limits ahead of potential quality failures.
    • Documentation and Reporting: Maintain comprehensive documentation of all CPV activities, including monitoring results, trend analyses, and corrective actions taken. This documentation should provide evidence of ongoing compliance with regulatory requirements and facilitate process evaluations during regular audits.

    Moreover, periodic reviews of the whole validation process should be conducted. This includes revisiting the risk assessments performed during the initial validation and evaluating whether there are any new risks introduced by operational changes, such as modifications to the production processes or the addition of new equipment.

    Step 5: Revalidation

    The final step in the validation lifecycle is revalidation. This process ensures that any changes to the compressed air systems or modifications to the manufacturing process do not adversely affect the system’s performance or product quality.

    Revalidation should be triggered by:

    • Change Management: Any significant change to the equipment, the manufacturing process, or regulatory requirements should initiate a revalidation process.
    • Scheduled Reviews: Regularly scheduled evaluations should take place to reassess the compressed air system’s operational performance and its influence on product quality.

    During revalidation, follow a similar protocol as the original validation, focusing on IQ, OQ, and PQ. Additionally, conduct a thorough review of all CPV data since the last validation to identify any performance issues or trends that were previously undetected.

    Document every step of the revalidation process, providing an audit trail that outlines all validation activities, results, and the conclusions drawn. This documentation is critical for meeting compliance standards set forth by regulatory bodies such as the FDA and EMA.

    In conclusion, validating compressed air systems in pharmaceutical manufacturing is a comprehensive process requiring careful planning, execution, and ongoing oversight. By adhering to established guidelines and incorporating robust validation practices, pharmaceutical companies can ensure that these essential utilities operate effectively and deliver quality-assured products.