Validation Summary Report (VSR)
Equipment
Cooling Tunnel / Cooling Conveyor
Subcategory
Suppositories & Implants
Area
Production
DQ/IQ/OQ/PQ Flags
Design Qualification: Yes
Installation Qualification: Yes
Operational Qualification: Yes
Performance Qualification: Yes
Acceptance Criteria Reference
URS Annex11
Key Critical Parameters
- Cooling Temperature
- Airflow
- Time
- PLC Logs
- Audit Trail
Requalification Frequency
12 Months
Summary
This Validation Summary Report outlines the validation activities performed for the Cooling Tunnel / Cooling Conveyor used in the production of suppositories and implants. The report includes details on the executed protocols and the verification of critical parameters.
Scope/Boundaries
The scope of this validation encompasses the installation, operation, and performance qualifications of the Cooling Tunnel / Cooling Conveyor. It includes all relevant documentation and validation activities performed within the production area.
Executed Protocol List
- DQ Protocol
- IQ Protocol
- OQ Protocol
- PQ Protocol
Deviations Summary
No deviations were noted during the validation activities. All protocols were executed as per the established guidelines.
CPP Verification Summary
All Key Critical Parameters were verified and met the acceptance criteria outlined in the URS Annex11. The cooling temperature, airflow, time, PLC logs, and audit trail were all confirmed to be within specified limits.
Conclusion
The Cooling Tunnel / Cooling Conveyor has been successfully validated for use in the production of suppositories and implants. All qualification activities were completed in accordance with regulatory requirements, and the equipment is deemed suitable for its intended use.
Attachments Index
- DQ Protocol Document
- IQ Protocol Document
- OQ Protocol Document
- PQ Protocol Document
- Validation Plan
- Validation Report
Approvals
Prepared by: _________________________
Date: _________________________
Approved by: _________________________
Date: _________________________