LVP/SVP Compounding Vessel (Jacketed SS) – Validation Summary Report (VSR) Template

Validation Summary Report (VSR)

Equipment: LVP/SVP Compounding Vessel (Jacketed SS)

Subcategory: IV Infusions (LVP/SVP – Bags/Bottles)

Area: Production

DQ/IQ/OQ/PQ Flags

Design Qualification (DQ): Yes

Installation Qualification (IQ): Yes

Operational Qualification (OQ): Yes

Performance Qualification (PQ): Yes

Acceptance Criteria Reference

URS Annex 11, Annex 15

Key Critical Parameters

  • Agitation
  • Temperature
  • Hold Time
  • PLC Audit Trail

Requalification Frequency

12 Months

Summary

This Validation Summary Report outlines the validation activities performed for the LVP/SVP Compounding Vessel (Jacketed SS) utilized in the production of IV infusions. It includes Design Qualification (DQ), Installation Qualification (IQ), Operational Qualification (OQ), and Performance Qualification (PQ) activities.

Scope and Boundaries

The scope of this validation includes all aspects of the LVP/SVP Compounding Vessel’s operation, focusing on key critical parameters related to the compounding of IV infusions. The boundaries encompass the equipment’s functionality within the production area.

Executed Protocol List

  • DQ Protocol – LVP/SVP Compounding Vessel
  • IQ Protocol – LVP/SVP Compounding Vessel
  • OQ Protocol – LVP/SVP Compounding Vessel
  • PQ Protocol – LVP/SVP Compounding Vessel

Deviations Summary

No significant deviations were noted during the validation process. All activities were executed as per the approved protocols.

CPP Verification Summary

All critical control parameters (Agitation, Temperature, Hold Time, PLC Audit Trail) were verified and met the acceptance criteria as outlined in the URS. Documentation of these verifications is attached.

Conclusion

The validation activities for the LVP/SVP Compounding Vessel (Jacketed SS) have been successfully completed. The equipment has been qualified for use in the production of IV infusions, and it meets all specified requirements.

See also  Extruder (Single Screw) – Qualification Certificate Template

Attachments Index

  • Attachment 1: DQ Protocol Report
  • Attachment 2: IQ Protocol Report
  • Attachment 3: OQ Protocol Report
  • Attachment 4: PQ Protocol Report
  • Attachment 5: Verification Documentation

Approvals

Prepared by: ____________________

Approved by: ____________________

Date: ____________________