Checkweigher – IQ Protocol

Document Control

Document ID: IQ-CHK-01

Version: 1.0

Effective Date: YYYY-MM-DD

Reviewed By: [Name]

Approval Date: YYYY-MM-DD

Installation Qualification Protocol for Checkweigher in Packaging Area

Meta Description: This document outlines the Installation Qualification (IQ) protocol for the Checkweigher used in the packaging of suppositories and implants, ensuring compliance with critical quality parameters.

Tags: Equipment Validation, Checkweigher, Installation Qualification, Suppositories, Implants

Objective

The objective of this Installation Qualification (IQ) protocol is to verify that the Checkweigher is installed correctly and functions in accordance with specified requirements to ensure the accurate weight of suppositories and implants.

Scope

This protocol applies to the Checkweigher used in the packaging area for the direct impact on the weight of suppositories and implants, ensuring compliance with regulatory standards.

Responsibilities

  • Validation Team: Responsible for executing the IQ protocol and documenting results.
  • Quality Assurance: Responsible for reviewing and approving the IQ protocol.
  • Maintenance Team: Responsible for ensuring the Checkweigher is maintained in accordance with SOPs.

Prerequisites

  • All installation procedures must be completed prior to IQ execution.
  • Training records for personnel operating the Checkweigher must be available.
  • Calibration records for the Checkweigher must be current.

Equipment Description

The Checkweigher is designed to verify the weight of suppositories during the packaging process, ensuring compliance with weight specifications and regulatory requirements. It includes features for weight accuracy, reject logic, and audit trail logs.

Test Plan

Test ID Procedure Acceptance Criteria Evidence
IQ-CHK-01 Verify installation of Checkweigher components. All components installed as per manufacturer specifications. Installation checklist.
IQ-CHK-02 Check calibration of Checkweigher. Calibration within specified limits. Calibration certificate.
IQ-CHK-03 Test weight accuracy with standard weights. Weight accuracy within ±0.5g. Test results log.
IQ-CHK-04 Verify reject logic functionality. Reject logic activates for out-of-spec weights. Test results log.
IQ-CHK-05 Audit trail log verification. Audit trail logs are complete and accessible. Audit trail report.
See also  Fitz Mill / Comminuting Mill – Qualification Execution Checklist

Detailed Test Cases

Test Case 1: Installation Verification

Procedure: Inspect all components of the Checkweigher to ensure proper installation.

Acceptance Criteria: All components must be installed as per manufacturer specifications.

Evidence: Document findings in the installation checklist.

Test Case 2: Calibration Check

Procedure: Perform calibration checks using certified weights.

Acceptance Criteria: Calibration must be within specified limits.

Evidence: Calibration certificate must be documented.

Test Case 3: Weight Accuracy Testing

Procedure: Use standard weights to test the accuracy of the Checkweigher.

Acceptance Criteria: Weight accuracy must be within ±0.5g.

Evidence: Document results in the test results log.

Test Case 4: Reject Logic Functionality

Procedure: Test the reject logic by inputting out-of-spec weights.

Acceptance Criteria: The system must activate reject logic for weights outside the specifications.

Evidence: Document results in the test results log.

Test Case 5: Audit Trail Verification

Procedure: Review the audit trail logs for completeness and accessibility.

Acceptance Criteria: All entries must be complete and easily retrievable.

Evidence: Audit trail report must be documented.

Deviations

Any deviations from the acceptance criteria must be documented and assessed for impact on product quality. A deviation report must be submitted to Quality Assurance for review.

Approvals

Prepared By: [Name] – [Title] – [Date]

Reviewed By: [Name] – [Title] – [Date]

Approved By: [Name] – [Title] – [Date]

Data Integrity Checks

For the CSV required, the following data integrity checks will be performed:

  • Verification of data entry accuracy against source documents.
  • Audit trails must be reviewed for completeness and consistency.
  • Access control measures must be in place to prevent unauthorized changes.
See also  Plunger Insertion Machine – IQ Protocol