Operational Qualification Protocol for Sanitary Transfer Pump

Objective: To validate the operational performance of the Sanitary Transfer Pump used for transferring sterile and non-sterile solutions in the production area.

Scope: This protocol applies to the Sanitary Transfer Pump utilized in the production of nasal and otic products, impacting product quality directly.

Responsibilities:

  • Validation Team: Responsible for executing the OQ protocol and documenting results.
  • Quality Assurance: Responsible for reviewing and approving the OQ protocol and results.
  • Production Staff: Ensure the equipment is operated according to the protocol during the qualification process.

Prerequisites:

  • Equipment installation must be complete and verified.
  • All staff involved in the qualification must be trained on the equipment and procedures.
  • All necessary materials and documentation must be available prior to testing.

Equipment Description:

The Sanitary Transfer Pump is designed for the transfer of sterile and non-sterile solutions. It features a shear seal mechanism to maintain integrity during operation, ensuring no contamination occurs during the transfer process.

Test ID Procedure Acceptance Criteria Evidence
OQ-001-01 Verify flow rate at specified settings. Flow rate within URS specifications. Flow rate measurement log.
OQ-001-02 Check shear seal integrity. No leaks or breaches observed. Visual inspection report.

Detailed Test Cases:

Test Case OQ-001-01: Flow Rate Verification

Objective: To confirm that the flow rate of the pump meets the specifications outlined in the URS.

See also  Glass Lined Reactor (GLR) – Traceability Matrix (URS ↔ Tests)

Procedure: Operate the pump at various settings and measure the flow rate using calibrated flow meters.

Acceptance Criteria: The flow rate must fall within the parameters defined in the URS.

Expected Results: Documented flow rate measurements should match acceptance criteria.

Test Case OQ-001-02: Shear Seal Integrity Check

Objective: To ensure the shear seal mechanism is functioning properly and maintains integrity during operation.

Procedure: Operate the pump under normal conditions and inspect for any signs of leakage or seal failure.

Acceptance Criteria: No leaks or breaches should be observed during the inspection.

Expected Results: Visual inspection report confirming integrity of the shear seal.

Deviations:

Any deviations from the protocol must be documented and assessed. A corrective action plan should be developed for any critical failures impacting product quality.

Approvals: