Vial Crimping Machine – PQ Protocol

Performance Qualification Protocol for the Vial Crimping Machine

Document Number: PQ-VCM-001

Version: 1.0

Effective Date: [Insert Date]

Prepared By: [Insert Name]

Reviewed By: [Insert Name]

Approved By: [Insert Name]

Objective

The objective of this Performance Qualification (PQ) protocol is to confirm that the Vial Crimping Machine consistently seals vials with aluminum caps in accordance with specified acceptance criteria, ensuring product integrity and compliance with regulatory standards.

Scope

This protocol applies to the Performance Qualification of the Vial Crimping Machine used in the production and packaging of sterile powders and lyophilized products.

Responsibilities

  • Validation Team: Prepare and execute the PQ protocol.
  • Quality Assurance: Review and approve the PQ protocol and results.
  • Production Personnel: Ensure proper operation of the equipment during testing.

Prerequisites

  • Installation Qualification (IQ) and Operational Qualification (OQ) must be completed and approved.
  • All relevant personnel must be trained on the operation of the Vial Crimping Machine.

Equipment Description

The Vial Crimping Machine is designed to securely seal vials with aluminum caps, ensuring the integrity of the product. The machine operates with a specified crimp force, which is critical to maintaining the sterility and quality of the product.

Test Plan

Test ID Procedure Acceptance Criteria Evidence
PQ-001 Verify crimp force settings against specifications. Crimp force must be within specified range. Crimp force log report.
PQ-002 Audit trail review for crimping process. Audit trail logs must show no anomalies. Audit trail log report.
See also  Sterile Filtration Skid (LVP) – DQ Protocol

Detailed Test Cases

Test Case 1: Crimp Force Verification

Procedure: Set the crimp force to the specified value and execute the crimping process. Measure the crimp force using a calibrated force gauge.

Acceptance Criteria: The measured crimp force must be within the defined acceptable range as per the URS Annex 11.

Evidence: Documented force gauge readings and comparison to acceptance criteria.

Test Case 2: Audit Trail Review

Procedure: Review the machine’s audit trail logs for the crimping process to ensure all records are complete and there are no discrepancies.

Acceptance Criteria: All records must be complete with no gaps or errors in the audit trail.

Evidence: Printed audit trail logs and summary of findings.

Deviations

Any deviations from the acceptance criteria must be documented and addressed in accordance with the standard operating procedures. Investigations must be initiated for any critical deviations observed during testing.

Approvals

Prepared By: ___________________ Date: ___________

Reviewed By: ___________________ Date: ___________

Approved By: ___________________ Date: ___________