Objective

The objective of this Performance Qualification (PQ) protocol is to verify that the Aseptic Filling Machine operates within specified limits to ensure the accurate filling of sterile IV bottles.

Scope

This protocol applies to the Aseptic Filling Machine used in the production area for filling sterile IV bottles, including both large volume parenterals (LVP) and small volume parenterals (SVP).

Responsibilities

The Validation Team is responsible for executing this protocol, documenting results, and ensuring compliance with applicable regulations and standards.

Prerequisites

  • Completion of Installation Qualification (IQ) and Operational Qualification (OQ).
  • Training of personnel on the use of the Aseptic Filling Machine.
  • Availability of all necessary materials and equipment for testing.

Equipment Description

The Aseptic Filling Machine is designed for the sterile filling of IV bottles. It is equipped with features to ensure precision in fill volume and proper stopper/cap placement.

Test Plan

Test ID Procedure Acceptance Criteria Evidence
PQ-001 Verify fill volume accuracy Fill volume within ±5% of target Volume measurement logs
PQ-002 Check stopper/cap placement 100% of stoppers/caps placed correctly Visual inspection records
PQ-003 Conduct reject audit trail All rejects logged and investigated Audit trail report

Detailed Test Cases

Test Case 1: Fill Volume Accuracy

Procedure: Fill a set of IV bottles with a predetermined volume and measure the actual volume filled. Repeat for multiple runs.

See also  Pass Box (Dynamic with HEPA) – Deviation Impact Assessment

Acceptance Criteria: The fill volume should be within ±5% of the target volume.

Test Case 2: Stopper/Cap Placement

Procedure: Inspect a sample of filled bottles to verify that the stoppers and caps are placed correctly.

Acceptance Criteria: 100% of inspected bottles should have stoppers and caps placed correctly.

Test Case 3: Reject Audit Trail

Procedure: Review the audit trail for any rejected bottles during the filling process.

Acceptance Criteria: All rejected bottles should be logged and investigated, with no discrepancies.

Deviations

Any deviations from the acceptance criteria must be documented and investigated. A root cause analysis should be performed, and corrective actions must be taken as necessary.