| URS ID | URS Statement | Risk (H/M/L) | DQ Test Ref | IQ Test Ref | OQ Test Ref | PQ Test Ref | Evidence/Record | Result |
|---|---|---|---|---|---|---|---|---|
| URS-001 | The equipment must maintain a consistent spray rate for optimal coating. | H | DQ-001 | IQ-001 | OQ-001 | PQ-001 | Spray Rate Calibration Report | |
| URS-002 | The temperature must be controlled within specified limits during operation. | H | DQ-002 | IQ-002 | OQ-002 | PQ-002 | Temperature Log | |
| URS-003 | Airflow must be adjustable and monitored to ensure coating effectiveness. | M | DQ-003 | IQ-003 | OQ-003 | PQ-003 | Airflow Validation Report | |
| URS-004 | Coating uniformity must meet specified criteria for product quality. | H | DQ-004 | IQ-004 | OQ-004 | PQ-004 | Coating Uniformity Test Results | |
| URS-005 | An audit trail must be maintained for all operations. | M | DQ-005 | IQ-005 | OQ-005 | PQ-005 | Audit Trail Log |