Objective

The objective of this Performance Qualification (PQ) protocol is to verify that the Depot Suspension Preparation Vessel operates within specified limits and meets the defined critical parameters for the production of depot suspensions.

Scope

This protocol applies to the PQ of the Depot Suspension Preparation Vessel utilized in the production area for the preparation of long-acting injectable depot suspensions. The scope includes the evaluation of critical process parameters and compliance with regulatory requirements.

Responsibilities

  • Validation Team: Responsible for executing the PQ protocol and documenting results.
  • Quality Assurance: Responsible for reviewing and approving the PQ documentation.
  • Production Personnel: Responsible for operating the equipment during the PQ process.

Prerequisites

  • Completion of Installation Qualification (IQ) and Operational Qualification (OQ).
  • Availability of necessary materials and equipment.
  • Training of personnel on the operation of the Depot Suspension Preparation Vessel.

Equipment Description

The Depot Suspension Preparation Vessel is designed for the mixing and preparation of depot suspension formulations. It features adjustable agitation speed, temperature control, and viscosity measurement capabilities, essential for ensuring product quality.

Test Plan

Test ID Procedure Acceptance Criteria Evidence
PQ-001 Verify agitation speed Agitation speed within specified range Calibration records
PQ-002 Measure temperature Temperature maintained within specified limits Temperature log
PQ-003 Assess viscosity Viscosity within acceptable range Viscosity measurement records
PQ-004 Document mixing time Mixing time meets specified duration Process log
See also  Pass Box (Dynamic with HEPA) – IQ Protocol

Detailed Test Cases

Test Case 1: Verify Agitation Speed

  • Procedure: Set the vessel to the specified agitation speed and confirm via calibrated tachometer.
  • Acceptance Criteria: Agitation speed must be within ±10% of the target speed.
  • Evidence: Record tachometer readings and calibration certificate.

Test Case 2: Measure Temperature

  • Procedure: Monitor the temperature using calibrated thermocouples.
  • Acceptance Criteria: Temperature must remain within ±2°C of the target temperature.
  • Evidence: Temperature logs from the monitoring system.

Test Case 3: Assess Viscosity

  • Procedure: Use a viscometer to measure the viscosity of the prepared suspension.
  • Acceptance Criteria: Viscosity must fall within specified limits as per URS.
  • Evidence: Viscosity measurement records.

Test Case 4: Document Mixing Time

  • Procedure: Start timing when mixing begins and stop when the specified mixing duration is reached.
  • Acceptance Criteria: Mixing time must not exceed the defined duration.
  • Evidence: Process log documenting start and end times.

Deviations

Any deviations from the protocol must be documented and assessed for impact on the validation results. A deviation report should be submitted for review and approval by Quality Assurance.

Approvals

Prepared By: ______________________

Approved By: ______________________

Date: ______________________