Validation Summary Report (VSR)
Equipment: Nano Tracking Analysis (NTA) System
Subcategory: NDDS – Critical NDDS Analytics (CQA/CPP)
Area: QC/R&D
DQ/IQ/OQ/PQ Flags: Yes/Yes/Yes/Yes
Acceptance Criteria Reference: URS Annex11
Key Critical Parameters: Accuracy, Data Integrity, Audit Trail
Requalification Frequency: 12 Months
Summary
This Validation Summary Report outlines the validation activities performed for the Nano Tracking Analysis (NTA) System in the QC/R&D area. The purpose of this report is to confirm that the system meets the necessary requirements and is suitable for its intended use.
Scope/Boundaries
The validation activities encompass the Design Qualification (DQ), Installation Qualification (IQ), Operational Qualification (OQ), and Performance Qualification (PQ) of the NTA System. The scope includes all critical parameters as defined in the URS Annex11.
Executed Protocol List
- DQ Protocol
- IQ Protocol
- OQ Protocol
- PQ Protocol
Deviations Summary
No deviations were recorded during the validation process. All protocols were executed as per the defined parameters and acceptance criteria.
CPP Verification Summary
Critical Process Parameters (CPP) were verified through appropriate testing and monitoring during the OQ and PQ phases. All results met the acceptance criteria outlined in the URS Annex11.
Conclusion
The Nano Tracking Analysis (NTA) System has successfully passed all validation phases (DQ, IQ, OQ, PQ) and is deemed compliant with regulatory requirements. The system is approved for use in QC/R&D activities.
Attachments Index
- Executed DQ Protocol
- Executed IQ Protocol
- Executed OQ Protocol
- Executed PQ Protocol
- Validation Summary Report
Approvals
Validated by: [Name, Title, Date]
Approved by: [Name, Title, Date]