Validation Summary Report (VSR)
Equipment: Automated Visual Inspection (AVI) System
Subcategory: NDDS – NDDS Packaging & Integrity
Area: Production
DQ/IQ/OQ/PQ Flags:
- Design Qualification (DQ): Yes
- Installation Qualification (IQ): Yes
- Operational Qualification (OQ): Yes
- Performance Qualification (PQ): Yes
Acceptance Criteria Reference:
URS Annex11
Key Critical Parameters:
- Detection Sensitivity
- Reject Logic
- Audit Trail
Requalification Frequency:
12 Months
Summary
This Validation Summary Report outlines the validation activities performed for the Automated Visual Inspection (AVI) System used in NDDS Packaging & Integrity. The report provides a comprehensive overview of the validation process, including Design Qualification (DQ), Installation Qualification (IQ), Operational Qualification (OQ), and Performance Qualification (PQ).
Scope/Boundaries
The scope of this validation encompasses the AVI system’s functionality within the production area, focusing on its ability to meet specified acceptance criteria as per URS Annex11. The boundaries include all relevant equipment, software, and operational processes associated with the AVI system.
Executed Protocol List
- DQ Protocol: AVI-DQ-001
- IQ Protocol: AVI-IQ-001
- OQ Protocol: AVI-OQ-001
- PQ Protocol: AVI-PQ-001
Deviations Summary
No deviations were recorded during the validation process. All executed protocols complied with the predefined acceptance criteria.
CPP Verification Summary
All critical process parameters (CPPs) were verified during the validation process. The detection sensitivity, reject logic, and audit trail functionalities were tested and met the acceptance criteria as outlined in the URS.
Conclusion
The validation activities for the Automated Visual Inspection (AVI) System have been successfully completed. The system has been demonstrated to meet all acceptance criteria and is deemed suitable for use in NDDS Packaging & Integrity within the production area.
Attachments Index
- Attachment 1: DQ Protocol Report
- Attachment 2: IQ Protocol Report
- Attachment 3: OQ Protocol Report
- Attachment 4: PQ Protocol Report
Approvals
Prepared by: [Name]
Approved by: [Name]
Date of Approval: [Date]