Shaking Incubator – Equipment Validation SOP

Standard Operating Procedure for Equipment Validation of Shaking Incubator

Purpose

The purpose of this SOP is to define the validation process for the Shaking Incubator used in cell culture growth within the Biologics Upstream Processing area.

Scope

This SOP applies to the validation of the Shaking Incubator utilized in the Production/Cell Culture area for biologics manufacturing.

Definitions

  • SOP: Standard Operating Procedure
  • CSV: Computer System Validation
  • DQ: Design Qualification
  • IQ: Installation Qualification
  • OQ: Operational Qualification
  • PQ: Performance Qualification

Roles

Roles involved in the validation process include:

  • Validation Manager
  • Quality Assurance (QA) Personnel
  • Production Staff
  • Maintenance Personnel

Lifecycle Procedure

  1. Document Requirements Specification (URS) for the Shaking Incubator.
  2. Perform Design Qualification (DQ) to ensure equipment meets user requirements.
  3. Conduct Installation Qualification (IQ) to verify proper installation.
  4. Execute Operational Qualification (OQ) to confirm operational parameters.
  5. Complete Performance Qualification (PQ) to ensure equipment performs as intended.

GDP Controls

Good Documentation Practices (GDP) must be followed throughout the validation process to ensure traceability and compliance.

Acceptance Criteria Governance

Acceptance criteria will be governed by the User Requirements Specification (URS) and Annex 11 of the applicable regulations.

Calibration/PM Governance

The Shaking Incubator must be calibrated and maintained according to the manufacturer’s specifications and the internal maintenance schedule.

Change Control Triggers

Any modifications to the equipment, process, or associated documentation must initiate a change control process.

Revalidation Triggers and Periodic Review

Revalidation is required every 12 months or when significant changes occur that may impact equipment performance.

See also  Weighing Balance (Platform/Floor) – Equipment Validation SOP

Records/Attachments List

  • User Requirements Specification (URS)
  • Validation Protocols (DQ/IQ/OQ/PQ)
  • Calibration Records
  • Change Control Documentation
  • Periodic Review Reports