Liquid Manufacturing Vessel (SS Jacketed Tank) – PQ Protocol

Document Control Number: PQ-001

Version: 1.0

Effective Date: 2023-10-01

Reviewed By: [Name]

Approval Date: [Date]

Performance Qualification Protocol for Liquid Manufacturing Vessel

Objective: To validate the performance of the Liquid Manufacturing Vessel used for compounding non-sterile liquids, ensuring it meets all critical parameters and acceptance criteria.

Scope: This protocol applies to the Liquid Manufacturing Vessel (SS Jacketed Tank) utilized in the production of oral liquids, syrups, and suspensions within the manufacturing area.

Responsibilities:

  • Validation Team: Execute the PQ protocol and document results.
  • Quality Assurance: Review and approve the completed protocol.
  • Production Team: Provide necessary support and access to the equipment.

Prerequisites:

  • Completion of Installation Qualification (IQ) and Operational Qualification (OQ).
  • Availability of all necessary equipment and materials.
  • Training of personnel on the use of the Liquid Manufacturing Vessel.

Equipment Description: The Liquid Manufacturing Vessel is a stainless steel jacketed tank designed for the compounding of non-sterile liquids. It features a PLC for monitoring and control, and is equipped with agitation capabilities to ensure uniform mixing of ingredients.

Test ID Procedure Acceptance Evidence
PQ-001-A Verify agitation speed at specified RPM. Agitation speed within +/- 5% of set point. PLC logs, calibration certificates.
PQ-001-B Measure temperature during hold time. Temperature maintained within specified range. Temperature logs, calibration certificates.
PQ-001-C Document hold time for compounding. Hold time meets defined criteria. Batch records, PLC logs.

Detailed Test Cases:

  • Test Case ID: PQ-001-A
    • Procedure: Set the agitation speed to the specified RPM and record the actual speed using the PLC.
    • Expected Result: The recorded speed must be within +/- 5% of the set point.
  • Test Case ID: PQ-001-B
    • Procedure: Initiate the hold time and monitor the temperature using PLC logs.
    • Expected Result: The temperature must remain within the specified range throughout the hold time.
  • Test Case ID: PQ-001-C
    • Procedure: Document the hold time from start to finish during the compounding process.
    • Expected Result: The documented hold time must meet the defined criteria.
See also  Manual Inspection Booth – Qualification Certificate Template

Deviations: Any deviations from the acceptance criteria must be documented and investigated. A root cause analysis should be performed, and corrective actions must be implemented.

Approvals:

  • Validation Team: ____________________ Date: ___________
  • Quality Assurance: ____________________ Date: ___________

Data Integrity Checks:

  • Regular audits of PLC logs to ensure data accuracy.
  • Backups of critical data to prevent loss.
  • Access controls to limit data manipulation.