Calibration Documents: Photo-stability Chamber UV (CAL-0185)
| Asset ID | CAL-0185 |
|---|---|
| Equipment | Photo-stability Chamber UV |
| Equipment Type | UV Radiometer |
| Department | Stability |
| Area/Location | Photostability |
| Process Use | UV exposure |
| Parameter | UV |
| Units | W/m2 |
| Range Min | 0 |
| Range Max | 100 |
| Acceptance Criteria | As per method |
| Calibration Frequency (days) | 365 |
| Calibration Type | External |
| Traceability | ISO17025 |
Table of Contents
Calibration SOP
1. Purpose
The calibration of the Photo-stability Chamber UV is performed to ensure the accuracy of UV exposure measurements, which is critical for maintaining patient safety, ensuring batch quality, and preserving data integrity. Accurate UV measurements are essential in stability studies to determine the effect of light on the stability of pharmaceutical products.
2. Scope
- Asset ID: CAL-0185
- Equipment Name/Type: Photo-stability Chamber UV / UV Radiometer
- Department/Area: Stability / Photostability
- Process Use: UV exposure
- Parameter: UV
- Range: 0 – 100 W/m²
- Units: W/m²
- Calibration Frequency: 365 days
3. Definitions
- Calibration: The process of verifying and adjusting the accuracy of a measurement instrument.
- Verification: The confirmation that a measurement instrument meets specified requirements.
- Adjustment: The process of modifying a measurement instrument to bring it into compliance with specified standards.
- As Found: The condition of the instrument prior to any adjustments.
- As Left: The condition of the instrument after adjustments have been made.
- OOT (Out of Tolerance): A condition where the measurement falls outside the specified acceptance criteria.
- Drift: The gradual change in the accuracy of a measurement instrument over time.
- Traceability: The ability to trace the measurement results back to national or international standards.
- Measurement Uncertainty: A parameter that characterizes the dispersion of values attributed to a measurement.
- Intermediate Check: A verification step performed between calibrations to ensure ongoing accuracy.
4. References
- Company Metrology SOP [TBD]
- ISO/IEC 17025 traceability via calibration certificates
- ALCOA+ principles
5. Responsibilities
- Technician/Metrology: Perform calibration and maintain records.
- QC/QA Reviewer: Review calibration results and documentation.
- Owner Department: Ensure equipment is available and in good condition for calibration.
- External Service Provider: Conduct external calibration as per schedule.
6. Safety & Preconditions
- Ensure environmental controls are in place (temperature, humidity).
- Allow for warm-up/stabilization of the equipment as per manufacturer guidelines.
- Maintain cleanliness of the equipment and surrounding area.
- Check that the equipment is level and stable.
- Verify power supply checks are completed before calibration.
7. Standards & Tools
- Reference Standards Required: [TBD]
- Traceability Statement: ISO17025
- Certificate Validity Check: Ensure all certificates are current and valid.
- Standard ID Placeholders: [TBD]
8. Calibration Strategy
Calibration will follow the As Found then As Left logic. The minimum number of test points will be five, including endpoints and midpoints within the specified range of 0 to 100 W/m². Each point should have three replicate readings to ensure accuracy and reliability.
9. Step-by-Step Procedure
- Preparation: Gather all necessary tools and reference standards.
- Stabilization: Allow the equipment to stabilize as per manufacturer guidelines.
- As Found Checks and Data Capture: Record initial readings at each test point.
- Adjustment Rules: If any readings are OOT, follow adjustment protocols if allowed; otherwise, escalate to QA.
- As Left Verification: Record final readings after adjustments.
- Labeling + Documentation Completion: Ensure all records are filled out accurately and contemporaneously (ALCOA+).
10. Acceptance Criteria & Calculations
Acceptance criteria: As per method. The error calculation formula will be: Error = (Observed Value – Reference Value) / Reference Value × 100%. Pass/Fail logic will be based on whether the error falls within acceptable limits. Rounding rule: [TBD].
11. Handling OOT / Failures
- Immediate containment: Tag equipment and stop use until resolved.
- Notification & deviation initiation: Inform relevant personnel of the OOT condition.
- Impact assessment trigger: Define impact window and review affected results/batches.
- Recalibration after repair/adjustment: Ensure equipment is recalibrated post-repair.
- QA disposition placeholders: [TBD].
12. Records & Retention
- Logbook entries must be made for each calibration event.
- Calibration report/certificate filing must be maintained.
- E-records if applicable: [TBD].
- Label content requirements: calibrated date, due date, by whom, status.
13. Annexures
Annexure A: Calibration Data Sheet
| Test Points | Reference | Observed | Error | Acceptance | Pass/Fail | As Found | As Left |
|---|---|---|---|---|---|---|---|
| [TBD] | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] |
Annexure B: Quick Checklist
- Environmental controls verified
- Equipment warm-up completed
- Cleanliness checked
- Leveling confirmed
- Power supply verified
Annexure C: Example Label Text
Calibration Date: [TBD]
Due Date: [TBD]
Calibrated By: [TBD]
Status: [TBD]
Calibration Protocol
Calibration Protocol
| Protocol ID | Asset ID | Equipment Name | Equipment Type | Dept | Area | Process Use | Parameter | Units | Range | Acceptance Criteria | Frequency | Calibration Type | Traceability |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| [TBD] | CAL-0185 | Photo-stability Chamber UV | UV Radiometer | Stability | Photostability | UV exposure | UV | W/m2 | 0 – 100 | As per method | 365 days | External | ISO17025 |
Environmental Conditions
Temperature: [TBD]
Relative Humidity: [TBD]
Vibration: [TBD]
Drafts: [TBD]
Test Point Selection
- Minimum: 0 W/m2
- 25% of Range: 25 W/m2
- 50% of Range: 50 W/m2
- 75% of Range: 75 W/m2
- Maximum: 100 W/m2
Results Table
| Test Point | Ref Value | Observed (As Found) | Error | Limit | Pass/Fail | Observed (As Left) | Error | Pass/Fail |
|---|---|---|---|---|---|---|---|---|
| 0 W/m2 | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] |
| 25 W/m2 | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] |
| 50 W/m2 | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] |
| 75 W/m2 | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] |
| 100 W/m2 | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] |
Stepwise Instructions
- Preparation: Ensure the Photo-stability Chamber UV is clean and calibrated as per the previous records.
- Stabilization: Allow the equipment to stabilize for [TBD] hours before performing readings.
- Performing Readings: Take three replicates at each test point to ensure accuracy.
- Calculating Error: Calculate the error for each observed value against the reference value.
- Evaluation: Compare the calculated errors against the acceptance criteria.
- Documentation: Record all observations in the results table and ensure data integrity (ALCOA+).
Deviation Instruction for OOT
In the event of an Out of Tolerance (OOT) result:
- Stop use of the equipment immediately.
- Notify the Quality Assurance (QA) department.
- Open a deviation report.
- Quarantine impacted results window: [TBD]
- Await QA decision on further actions.
Approvals
| Prepared By | Reviewed By | Approved By |
|---|---|---|
| [Signature/Date] | [Signature/Date] | [Signature/Date] |
Calibration Checklist
| Asset ID | Equipment | Dept | Area | Parameter | Range | Acceptance | Frequency | Traceability |
|---|---|---|---|---|---|---|---|---|
| CAL-0185 | Photo-stability Chamber UV | Stability | Photostability | UV | 0 – 100 W/m2 | As per method | 365 days | ISO17025 |
Pre-calibration
- [ ] Verify environmental conditions are within specified limits
- [ ] Allow equipment to warm up for the required duration
- [ ] Clean the equipment as per SOP
- [ ] Ensure the equipment is level
- [ ] Check validity of reference standards
- [ ] Confirm logbook is ready for data entry
As Found Execution
- [ ] Set equipment to specified setpoints
- [ ] Perform required number of repeats
- [ ] Record raw data accurately
- [ ] Perform necessary calculations
OOT Immediate Actions
- [ ] Tag out the equipment
- [ ] Stop use of the equipment
- [ ] Notify relevant personnel
- [ ] Document deviation
- [ ] Trigger impact review
As Left Verification
- [ ] Conduct post-adjustment checks
- [ ] Confirm results are within specified limits
Documentation & Closure
- [ ] Update equipment label
- [ ] Attach calibration certificate
- [ ] Obtain reviewer sign-off
- [ ] Update next due date in logbook
Data Integrity (ALCOA+): Ensure all data recorded is Attributable, Legible, Contemporaneous, Original, and Accurate.
Out of Tolerance (OOT) Handling: Follow established procedures for addressing OOT results to ensure compliance and quality assurance.
Deviation Impact Assessment
| Event Summary |
|---|
|
Asset: Photo-stability Chamber UV Date: [TBD] Discovered By: [TBD] Document References: [TBD] As Found Results Summary: [TBD] |
Immediate Containment Checklist
- Stop use of the equipment
- Label/Tag the equipment as out of tolerance
- Segregate impacted work
Define Impact Window
Last known in-tolerance date: [TBD] to discovery date: [TBD]
Product/Batch/Test Impact Review
| Batch/Study/Report ID | Results Potentially Impacted | Re-test/Re-weigh Decision |
|---|---|---|
| [TBD] | [TBD] | [TBD] |
Data Integrity Review Prompts (ALCOA+)
- Attributable: [TBD]
- Legible: [TBD]
- Contemporaneous: [TBD]
- Original: [TBD]
- Accurate: [TBD]
- Complete: [TBD]
- Consistent: [TBD]
- Enduring: [TBD]
- Available: [TBD]
Risk Assessment
| Severity | Probability | Detectability | Rationale | Overall Risk |
|---|---|---|---|---|
| [TBD] | [TBD] | [TBD] | [TBD] | [TBD] |
Investigation Summary
Root Cause: [TBD]
CAPA Plan
| Action | Owner | Due Date | Effectiveness Check |
|---|---|---|---|
| [TBD] | [TBD] | [TBD] | [TBD] |
QA Disposition
Release/Hold/Retest/Recall Triggers: [TBD]
Calibration Certificate
Certificate No: [TBD]
Date: [TBD]
Next Due Date: [TBD]
Asset Details
| Asset ID | Equipment Name | Equipment Type | Dept | Area | Make/Model | Serial No | Location | Parameter/Range/Units | Acceptance Criteria |
|---|---|---|---|---|---|---|---|---|---|
| CAL-0185 | Photo-stability Chamber UV | UV Radiometer | Stability | Photostability | [TBD] | [TBD] | [TBD] | UV (0 – 100 W/m2) | As per method |
Conditions
Environment: [TBD]
Reference Standards
| Standard Name/ID | Certificate No | Due Date | Traceability Statement |
|---|---|---|---|
| [TBD] | [TBD] | [TBD] | ISO17025 |
Results
As Found Results
| Test Point | Measured Value (W/m2) | Acceptance Criteria |
|---|---|---|
| 1 | [TBD] | As per method |
| 2 | [TBD] | As per method |
| 3 | [TBD] | As per method |
| 4 | [TBD] | As per method |
| 5 | [TBD] | As per method |
As Left Results
| Test Point | Measured Value (W/m2) | Acceptance Criteria |
|---|---|---|
| 1 | [TBD] | As per method |
| 2 | [TBD] | As per method |
| 3 | [TBD] | As per method |
| 4 | [TBD] | As per method |
| 5 | [TBD] | As per method |
Measurement Uncertainty Statement: [TBD]
Statement of Conformity: [Pass/Fail overall]
Remarks: [TBD]
Signatures
Performed by: ____________________ Date: ___________
Checked by: ______________________ Date: ___________
Approved by: _____________________ Date: ___________