Tablet Press Compression Force Sensor (CAL-0210) – Calibration Documents

Calibration Documents: Tablet Press Compression Force Sensor (CAL-0210)

Asset ID CAL-0210
Equipment Tablet Press Compression Force Sensor
Equipment Type Compression Force Sensor
Department Production
Area/Location Compression
Process Use Compression control
Parameter Force
Units kN
Range Min 0
Range Max 100
Acceptance Criteria ±2%
Calibration Frequency (days) 365
Calibration Type External
Traceability ISO17025

Calibration SOP

1. Purpose

The calibration of the Tablet Press Compression Force Sensor is performed to ensure accurate measurement of compression force during tablet production. This calibration controls risks related to accuracy, patient safety, batch quality, and data integrity, thereby ensuring compliance with Good Manufacturing Practices (GMP).

2. Scope

  • Asset ID: CAL-0210
  • Equipment Name: Tablet Press Compression Force Sensor
  • Equipment Type: Compression Force Sensor
  • Department/Area: Production / Compression
  • Process Use: Compression control
  • Parameter: Force
  • Range: 0 kN to 100 kN
  • Units: kN
  • Calibration Frequency: 365 days

3. Definitions

  • Calibration: The process of comparing a measurement instrument to a known standard to determine its accuracy.
  • Verification: The process of confirming that a measurement instrument meets specified requirements.
  • Adjustment: The process of modifying a measurement instrument to bring it into compliance with specifications.
  • As Found: The condition of the equipment prior to any adjustments made during calibration.
  • As Left: The condition of the equipment after adjustments have been made and verified.
  • OOT (Out of Tolerance): A condition where a measurement falls outside of the specified acceptance criteria.
  • Drift: The gradual change in a measurement instrument’s output over time.
  • Traceability: The ability to verify the history, location, or application of an item by means of documented recorded identification.
  • Measurement Uncertainty: A parameter that characterizes the range of values within which the true value of a measurement lies.
  • Intermediate Check: A periodic check performed to ensure that a measurement instrument remains within specified limits between calibrations.

4. References

  • Company Metrology SOP [TBD]
  • ISO/IEC 17025 traceability via calibration certificates
  • ALCOA+ principles

5. Responsibilities

  • Technician/Metrology: Perform calibration and document results.
  • QC/QA Reviewer: Review calibration documentation and results.
  • Owner Department: Ensure equipment is available and in good condition for calibration.
  • External Service Provider: Conduct external calibration as required.

6. Safety & Preconditions

  • Ensure environmental controls are in place (temperature, humidity).
  • Allow equipment to warm up and stabilize as per manufacturer guidelines.
  • Maintain cleanliness of the equipment and surrounding area.
  • Check that the equipment is level and properly positioned.
  • Verify power supply is stable and within required specifications.
See also  Incubator Temp Sensor (20-25°C) (CAL-0156) - Calibration Documents

7. Standards & Tools

  • Reference Standards Required: [TBD]
  • Traceability Statement: Calibration will be traceable to ISO17025.
  • Certificate Validity Check: Ensure all calibration certificates are valid and up to date.

8. Calibration Strategy

Calibration will follow the As Found then As Left logic. The minimum number of test points will be five, including endpoints (0 kN and 100 kN) and midpoints. Each point will have three replicate readings as a best practice.

9. Step-by-Step Procedure

  1. Preparation: Gather all necessary tools and reference standards.
  2. Stabilization: Allow the equipment to stabilize for a specified period.
  3. As Found checks and data capture: Record initial measurements at designated points.
  4. Adjustment rules: If OOT is detected, follow adjustment protocols; otherwise, escalate to QA.
  5. As Left verification: Confirm that adjustments bring the equipment within acceptance criteria.
  6. Labeling + documentation completion: Complete all required documentation and label the equipment accordingly.

Record raw observations contemporaneously to ensure data integrity (ALCOA+).

10. Acceptance Criteria & Calculations

Acceptance criteria for the Tablet Press Compression Force Sensor is ±2%. The error calculation formula is:

Error (%) = (Observed Value – True Value) / True Value × 100

Pass/Fail Logic: If the calculated error is within ±2%, the result is a pass; otherwise, it is a fail.

Rounding rule: [TBD]

11. Handling OOT / Failures

  • Immediate containment: Tag the equipment and cease use.
  • Notification & deviation initiation: Notify QA and initiate a deviation report.
  • Impact assessment trigger: Define the impact window and review all affected results/batches.
  • Recalibration after repair/adjustment: Ensure recalibration is performed post-adjustment.
  • QA disposition placeholders: [TBD]

12. Records & Retention

  • Logbook entries must include all calibration activities.
  • Calibration report/certificate filing must be maintained for audit purposes.
  • E-records if applicable: [TBD]
  • Label content requirements: calibrated date, due date, by whom, status.

13. Annexures

Annexure A: Calibration Data Sheet

Test Points Reference Observed Error Acceptance Pass/Fail As Found As Left
[TBD] [TBD] [TBD] [TBD] [TBD] [TBD] [TBD] [TBD]

Annexure B: Quick Checklist

  • Environmental controls verified
  • Equipment warm-up completed
  • Cleanliness checked
  • Leveling confirmed
  • Power supply stable

Annexure C: Example Label Text

Calibration Date: [TBD]
Due Date: [TBD]
Calibrated By: [TBD]
Status: [TBD]

See also  Bioreactor DO Probe (CAL-0302) - Calibration Documents

⬆ Back to TOC


Calibration Protocol

Calibration Protocol

Protocol ID Asset ID Equipment Name Equipment Type Dept Area Process Use Parameter Units Range Acceptance Criteria Frequency Calibration Type Traceability
[TBD] CAL-0210 Tablet Press Compression Force Sensor Compression Force Sensor Production Compression Compression control Force kN 0 – 100 ±2% 365 days External ISO17025

Environmental Conditions

Temperature: [TBD]

Relative Humidity: [TBD]

Vibration: [TBD]

Drafts: [TBD]

Test Point Selection

  • Min: 0 kN
  • 25%: 25 kN
  • 50%: 50 kN
  • 75%: 75 kN
  • Max: 100 kN

Results Table

Test Point Ref Value Observed (As Found) Error Limit Pass/Fail Observed (As Left) Error Pass/Fail
0 kN [TBD] [TBD] [TBD] ±2% [TBD] [TBD] [TBD] [TBD]
25 kN [TBD] [TBD] [TBD] ±2% [TBD] [TBD] [TBD] [TBD]
50 kN [TBD] [TBD] [TBD] ±2% [TBD] [TBD] [TBD] [TBD]
75 kN [TBD] [TBD] [TBD] ±2% [TBD] [TBD] [TBD] [TBD]
100 kN [TBD] [TBD] [TBD] ±2% [TBD] [TBD] [TBD] [TBD]

Stepwise Instructions

  1. Preparation: Ensure the calibration equipment is clean and in good working condition. Verify that the calibration standards are within their calibration date.
  2. Stabilization: Allow the equipment to stabilize for [TBD] minutes before taking measurements.
  3. Performing Readings: Take three replicate readings at each test point. Record all observed values.
  4. Calculating Error: Calculate the error for each observed value using the formula: Error = (Observed – Ref Value) / Ref Value * 100.
  5. Evaluation: Compare the calculated error against the acceptance criteria of ±2%.
  6. Documentation: Complete the results table and ensure all data is recorded accurately, maintaining ALCOA+ principles.

Deviation Instruction for OOT

If any observed value is outside the acceptance criteria:

  • Stop use of the equipment immediately.
  • Notify the supervisor and quality assurance.
  • Open a deviation report.
  • Quarantine the impacted results window: [TBD].
  • Await QA decision on further actions.

Approvals

Prepared By Reviewed By Approved By
[Signature/Date] [Signature/Date] [Signature/Date]

⬆ Back to TOC


Calibration Checklist

Asset ID Equipment Dept Area Parameter Range Acceptance Frequency Traceability
CAL-0210 Tablet Press Compression Force Sensor Production Compression Force 0 – 100 kN ±2% 365 days ISO17025

Pre-calibration

  • [ ] Verify environmental conditions are within specified limits
  • [ ] Ensure equipment has warmed up adequately
  • [ ] Clean the equipment as per SOP
  • [ ] Level the equipment if necessary
  • [ ] Check validity of reference standards
  • [ ] Ensure logbook is ready for entries
See also  Digital Thermometer (CAL-0050) - Calibration Documents

As Found Execution

  • [ ] Set the initial calibration setpoints
  • [ ] Perform repeat measurements
  • [ ] Record all raw data accurately
  • [ ] Perform necessary calculations for results

OOT Immediate Actions

  • [ ] Tag out the equipment
  • [ ] Stop use of the equipment immediately
  • [ ] Notify relevant personnel
  • [ ] Document deviation from acceptance criteria
  • [ ] Trigger impact review process

As Left Verification

  • [ ] Conduct post-adjustment checks
  • [ ] Confirm all measurements are within specified limits

Documentation & Closure

  • [ ] Update equipment label with calibration details
  • [ ] Attach calibration certificate to documentation
  • [ ] Obtain reviewer sign-off
  • [ ] Update next due date in logbook

⬆ Back to TOC


Deviation Impact Assessment

Event Summary
Asset: Tablet Press Compression Force Sensor
Date: [TBD]
Discovered By: [TBD]
Document References: [TBD]
As Found Results Summary: [TBD]

Immediate Containment Checklist

  • Stop use of the asset
  • Label/tag the asset as out of tolerance
  • Segregate impacted work

Define Impact Window

Last known in-tolerance date: [TBD] to discovery date: [TBD]

Product/Batch/Test Impact Review

Batch/Study/Report ID Results Potentially Impacted Re-test/Re-weigh Decision
[TBD] [TBD] [TBD]

Data Integrity Review Prompts (ALCOA+)

  • Attributable: [TBD]
  • Legible: [TBD]
  • Contemporaneous: [TBD]
  • Original: [TBD]
  • Accurate: [TBD]
  • Complete: [TBD]
  • Consistent: [TBD]
  • Enduring: [TBD]
  • Available: [TBD]

Risk Assessment

Severity Probability Detectability Rationale Overall Risk
[TBD] [TBD] [TBD] [TBD] [TBD]

Investigation Summary

Root Cause: [TBD]

CAPA Plan

Action Owner Due Date Effectiveness Check
[TBD] [TBD] [TBD] [TBD]

QA Disposition

Release/Hold/Retest/Recall Triggers: [TBD]

⬆ Back to TOC


Calibration Certificate

Certificate No: [TBD]

Date: [TBD]

Next Due Date: [TBD]

Asset Details

Asset ID Equipment Name Equipment Type Dept Area Make/Model Serial No Location Parameter/Range/Units Acceptance Criteria
CAL-0210 Tablet Press Compression Force Sensor Compression Force Sensor Production Compression [TBD] [TBD] [TBD] Force: 0 – 100 kN ±2%

Conditions

Environment: [TBD]

Reference Standards

Standard Name/ID Certificate No Due Date Traceability Statement
[TBD] [TBD] [TBD] Traceability to ISO17025

Results

As Found Results

Test Point Measured Value (kN) Pass/Fail
1 [TBD] [TBD]
2 [TBD] [TBD]
3 [TBD] [TBD]
4 [TBD] [TBD]
5 [TBD] [TBD]

As Left Results

Test Point Measured Value (kN) Pass/Fail
1 [TBD] [TBD]
2 [TBD] [TBD]
3 [TBD] [TBD]
4 [TBD] [TBD]
5 [TBD] [TBD]

Measurement Uncertainty Statement: [TBD]

Statement of Conformity: [Pass/Fail overall]

Remarks: [TBD]

Signatures

Performed by: ______________________ Date: ___________

Checked by: ______________________ Date: ___________

Approved by: ______________________ Date: ___________

⬆ Back to TOC