Objective

The objective of this Performance Qualification (PQ) protocol is to validate the operational performance of the Drum Tippler/Drum Tumbler in the production area, ensuring it meets specified requirements for emptying and transferring drums without compromising product quality.

Scope

This protocol applies to the Drum Tippler/Drum Tumbler used in the production and dispensing of solid dosage forms (OSD). It encompasses the validation of critical parameters and acceptance criteria as outlined in the User Requirements Specification (URS).

Responsibilities

  • Validation Team: Prepare and execute the PQ protocol.
  • Quality Assurance: Review and approve the protocol and results.
  • Production Personnel: Assist in the execution of the protocol and provide necessary documentation.

Prerequisites

  • Completion of Installation Qualification (IQ) and Operational Qualification (OQ).
  • Availability of all necessary equipment and materials for testing.
  • Training of personnel involved in the execution of this protocol.

Equipment Description

The Drum Tippler/Drum Tumbler is a mechanical device designed for the efficient and safe emptying and transferring of drums containing solid dosage forms. The equipment features a tip angle and speed interlock system to ensure safe operation.

Test Plan

Test ID Procedure Acceptance Evidence
PQ-001 Verify tip angle and speed interlocks functionality. Interlocks must engage and disengage as specified in URS. Test log and observation notes.
PQ-002 Conduct emptying cycle with specified drum. Drum must be emptied without spillage. Video recording and weight measurement.
See also  Bin Lifter / IBC Lifter – IQ Protocol

Detailed Test Cases

Test Case 1: Verify Tip Angle and Speed Interlocks Functionality

Test ID: PQ-001

Procedure: Activate the tip angle and speed interlocks and observe their engagement and disengagement during operation.

Acceptance Criteria: Interlocks must engage and disengage as specified in URS.

Evidence: Document observations in the test log.

Test Case 2: Conduct Emptying Cycle

Test ID: PQ-002

Procedure: Load a specified drum into the Drum Tippler and initiate the emptying cycle.

Acceptance Criteria: Drum must be emptied without spillage.

Evidence: Video recording of the process and weight measurement before and after.

Deviations

Any deviations from this protocol must be documented and justified. A formal deviation report should be submitted for review and approval.