Split Butterfly Valve (SBV) Transfer System – OQ Protocol

Operational Qualification Protocol for the Split Butterfly Valve Transfer System

Document Number: OQ-SBV-001

Version: 1.0

Effective Date: [Insert Date]

Review Date: [Insert Date]

Prepared by: [Insert Name]

Approved by: [Insert Name]

Objective

The objective of this Operational Qualification (OQ) protocol is to verify that the Split Butterfly Valve (SBV) Transfer System operates in accordance with the User Requirement Specification (URS) and meets the defined acceptance criteria for containment seal integrity during docking and transfer operations.

Scope

This protocol applies to the Split Butterfly Valve Transfer System used in the production and containment areas for solid dosage forms (OSD). It encompasses the qualification of the system to ensure direct product impact and criticality are adequately addressed.

Responsibilities

The following personnel are responsible for executing this protocol:

  • Validation Team: Conducts the qualification tests and documents results.
  • Quality Assurance: Reviews and approves the protocol and results.
  • Operations: Provides operational support during testing.

Prerequisites

  • Installation Qualification (IQ) must be completed and approved.
  • All necessary training for personnel must be completed.
  • Equipment must be cleaned and ready for use.

Equipment Description

The Split Butterfly Valve Transfer System is designed for contained docking and transfer of materials in solid dosage form production. It ensures the integrity of the containment seal during operation, preventing contamination and ensuring product quality.

Test Plan

Test ID Procedure Acceptance Criteria Evidence
OQ-SBV-001 Verify containment seal integrity during docking. Containment seal integrity must be maintained with no leaks. Leak test results, visual inspection records.
OQ-SBV-002 Check operational functionality of the SBV system. System must operate without errors or alarms. Operational logs, system performance data.
See also  Contained Transfer Port (RTP-like) – Validation Summary Report (VSR) Template

Detailed Test Cases

Test Case 1: Containment Seal Integrity

Procedure: Dock the SBV system and perform a leak test using a suitable method (e.g., pressure decay).

Acceptance Criteria: No leaks detected during the test period.

Evidence: Documented results of the leak test.

Test Case 2: Operational Functionality

Procedure: Operate the SBV system through a complete cycle of docking and transfer.

Acceptance Criteria: System operates without any errors or alarms; all parameters within specified range.

Evidence: Operational logs and performance data recorded during the test.

Deviations

Any deviations from the protocol must be documented and justified. Approval for deviations must be obtained from Quality Assurance before proceeding with testing.

Approvals

Prepared by: ______________________ Date: ___________

Approved by: ______________________ Date: ___________