Objective

The objective of this Installation Qualification (IQ) protocol is to verify that the Dust Extraction Unit (LEV) is installed correctly and operates in accordance with its intended use for dust capture in the production/containment area, ensuring operator and product protection.

Scope

This protocol applies to the Dust Extraction Unit installed in the Solid Dosage Form (OSD) production area. It covers the installation verification, operational parameters, and compliance with the User Requirement Specification (URS).

Responsibilities

The following personnel are responsible for the execution and approval of this protocol:

  • Validation Team: Execute and document the IQ protocol.
  • Quality Assurance: Review and approve the protocol and results.
  • Engineering: Ensure equipment installation meets specifications.

Prerequisites

Prior to executing this protocol, the following must be completed:

  • Installation of the Dust Extraction Unit as per manufacturer specifications.
  • Completion of all necessary training for personnel involved in the validation process.
  • Availability of all required documentation, including User Requirement Specification (URS).

Equipment Description

The Dust Extraction Unit (LEV) is designed for dust capture during the dispensing of solid dosage forms. It operates by creating a suction effect to capture airborne particles, ensuring a safe working environment.

Test Plan

Test ID Procedure Acceptance Criteria Evidence
IQ-LEV-01 Verify installation against manufacturer specifications. Installation matches specifications outlined in URS. Installation checklist, photographs.
IQ-LEV-02 Measure airflow capture velocity. Airflow capture velocity meets specified range. Calibration report, measurement logs.
IQ-LEV-03 Perform filter integrity test. Filter integrity confirmed with no leaks. Test results, filter integrity report.
See also  Bin Lifter / IBC Lifter – Deviation Impact Assessment

Detailed Test Cases

Test Case 1: Installation Verification

Verify that the Dust Extraction Unit is installed according to the manufacturer’s specifications. Document any discrepancies.

Test Case 2: Airflow Capture Velocity Measurement

Measure the airflow capture velocity at designated points. Ensure it falls within the acceptable range as per the URS.

Test Case 3: Filter Integrity Testing

Conduct a filter integrity test to ensure there are no leaks. Document the results and any necessary actions taken.

Deviations

Any deviations from the protocol must be documented and justified. A deviation report must be prepared and approved by Quality Assurance.

Approvals

The following individuals must approve this Installation Qualification Protocol:

  • Prepared By: [Insert Name] – [Title]
  • Reviewed By: [Insert Name] – [Title]
  • Approved By: [Insert Name] – [Title]