Magnetic Separator (Inline) – OQ Protocol

Document Control:

Protocol Number: OQ-001

Version: 1.0

Effective Date: [Insert Date]

Reviewed By: [Insert Name]

Approval Date: [Insert Date]

Operational Qualification Protocol for Inline Magnetic Separator

Objective: To validate the operational performance of the Inline Magnetic Separator in the removal of ferrous contamination from solid dosage forms.

Scope: This protocol applies to the Inline Magnetic Separator used in the Production/Material Transfer area for solid dosage forms where direct product impact is critical.

Responsibilities:

  • Validation Team: Execute the protocol and document results.
  • Quality Assurance: Review and approve the protocol and results.
  • Production Personnel: Ensure equipment is set up and maintained as per SOPs.

Prerequisites:

  • Completion of Installation Qualification (IQ).
  • Training of personnel on equipment operation.
  • Availability of required materials for testing.

Equipment Description:

The Inline Magnetic Separator is designed to remove ferrous contaminants from materials during production. It operates by utilizing a magnetic field to attract and capture ferrous particles, ensuring product safety and quality.

Test ID Procedure Acceptance Criteria Evidence
OQ-001-01 Measure magnet strength using calibrated gaussmeter. Magnet strength must be ≥ [Insert Value] Gauss as per URS. Calibration report and measurement log.
OQ-001-02 Perform capture efficiency test with known ferrous particles. Capture efficiency must be ≥ [Insert Percentage]% as per URS. Test results and analysis report.

Detailed Test Cases:

  1. Test ID: OQ-001-01
    • Procedure: Use a calibrated gaussmeter to measure the magnetic field strength at various points on the separator.
    • Expected Result: The measurements should meet or exceed the specified value in the URS.
  2. Test ID: OQ-001-02
    • Procedure: Introduce a known quantity of ferrous particles into the flow and measure the quantity captured post-separator.
    • Expected Result: The captured quantity should meet or exceed the acceptance criteria defined in the URS.
See also  Weighing Balance (Analytical) – Validation Summary Report (VSR) Template

Deviations: Any deviations from the protocol must be documented and justified. All deviations must be reviewed and approved by Quality Assurance.

Approvals:

__________________________
Validation Team Lead

__________________________
Quality Assurance