Design Qualification Protocol for De-lumper / Lump Breaker in Solid Dosage Form Validation

Objective: To establish the design qualification for the De-lumper / Lump Breaker used in the production of solid dosage forms, ensuring it meets the required specifications and operational standards.

Scope: This protocol applies to the validation of the De-lumper / Lump Breaker equipment in the production area, specifically for breaking lumps in powder and granules.

Responsibilities:

  • Validation Team: Prepare and execute the DQ protocol.
  • Quality Assurance: Review and approve the DQ documentation.
  • Production Team: Provide insights on operational requirements.

Prerequisites:

  • Completion of User Requirements Specification (URS).
  • Availability of equipment and operational manuals.
  • Training of personnel on equipment operation.

Equipment Description: The De-lumper / Lump Breaker is designed to break down large lumps in powder and granules, ensuring a uniform particle size for optimal processing in solid dosage form production. The critical parameters for operation include blade speed and torque.

Test ID Procedure Acceptance Criteria Evidence
DQ-001 Verify blade speed at operational settings. Blade speed within specified range as per URS. Calibration report.
DQ-002 Measure torque during operation. Torque levels must meet URS specifications. Torque measurement logs.

Detailed Test Cases:

  • Test Case 1: Check blade speed.
    • Procedure: Run the equipment at specified speeds and document readings.
    • Acceptance Criteria: Speeds must be within the range specified in the URS.
    • Evidence: Speed log sheets and equipment settings.
  • Test Case 2: Verify torque measurement.
    • Procedure: Operate the equipment and measure torque using a calibrated torque meter.
    • Acceptance Criteria: Torque must be within URS-defined limits.
    • Evidence: Torque measurement logs and calibration certificates.
See also  Dust Extraction Unit (LEV for dispensing) – IQ Protocol

Deviations: Any deviations from the acceptance criteria must be documented and investigated. A formal deviation report should be generated for each incident.

Approvals: