Document Control
Document ID: PQ-JM-001
Version: 1.0
Effective Date: YYYY-MM-DD
Reviewed By: [Name]
Approval Date: YYYY-MM-DD
Performance Qualification Protocol for Jet Mill / Micronizer
Meta Description: This document outlines the Performance Qualification (PQ) protocol for the Jet Mill / Micronizer used in Solid Dosage Form equipment validation, focusing on critical parameters and acceptance criteria.
Tags: Equipment Validation, Performance Qualification, Jet Mill, Micronizer, Solid Dosage Form
Objective
The objective of this protocol is to establish the performance qualification of the Jet Mill / Micronizer used for micronization in the production of solid dosage forms, ensuring compliance with the User Requirement Specification (URS).
Scope
This protocol applies to the Jet Mill / Micronizer located in the production/milling area and is intended for use in the micronization process of products with direct impact on quality.
Responsibilities
- Validation Team: Responsible for executing the PQ protocol and documenting results.
- Quality Assurance: Responsible for reviewing and approving the protocol and results.
- Production Personnel: Responsible for operating the equipment in accordance with the protocol.
Prerequisites
- Completion of Installation Qualification (IQ) and Operational Qualification (OQ).
- Training of personnel on the operation of the Jet Mill / Micronizer.
- Availability of required materials and equipment for testing.
Equipment Description
The Jet Mill / Micronizer is designed for the micronization of solid dosage forms. It utilizes high-velocity air to achieve particle size reduction and is critical for ensuring product quality.
Test Plan
| Test ID | Procedure | Acceptance Criteria | Evidence |
|---|---|---|---|
| PQ-01 | Measure air pressure during operation | Within specified range as per URS | Calibration records |
| PQ-02 | Monitor feed rate output | Consistent with URS requirements | Test log |
| PQ-03 | Analyze particle size distribution (PSD) | Meets URS acceptance criteria | PSD reports |
Detailed Test Cases
Test Case PQ-01
Objective: To verify that the air pressure during operation is within the specified range.
Procedure: Record the air pressure at the start and during the operation of the Jet Mill.
Acceptance Criteria: Air pressure must remain within the specified range as defined in the URS.
Evidence: Documented calibration records.
Test Case PQ-02
Objective: To ensure the feed rate output is consistent with URS requirements.
Procedure: Measure the feed rate output at various operational stages.
Acceptance Criteria: Feed rate must be consistent with the specifications outlined in the URS.
Evidence: Test log documenting feed rates.
Test Case PQ-03
Objective: To confirm that the particle size distribution (PSD) meets the acceptance criteria.
Procedure: Collect samples during operation and analyze for PSD using appropriate methods.
Acceptance Criteria: PSD must meet the criteria established in the URS.
Evidence: PSD analysis reports.
Deviations
Any deviations from the protocol must be documented and justified. If acceptance criteria are not met, the validation team must investigate the cause and determine the appropriate corrective actions.
Approvals
__________________________
Validation Team Lead
__________________________
Quality Assurance
“`