Planetary Mixer (Wet Mass) – Validation Summary Report (VSR) Template

Validation Summary Report (VSR)

Equipment Information

Equipment: Planetary Mixer (Wet Mass)

Subcategory: Solid Dosage Form (OSD)

Area: Production/Granulation

DQ/IQ/OQ/PQ Flags: Yes/Yes/Yes/Yes

Acceptance Criteria Reference: URS

Key Critical Parameters: Speed, Time, Bowl Clearance

Requalification Frequency: 24 Months

Summary

This Validation Summary Report documents the validation activities conducted for the Planetary Mixer (Wet Mass) used in the production of solid dosage forms. The report encompasses the Design Qualification (DQ), Installation Qualification (IQ), Operational Qualification (OQ), and Performance Qualification (PQ) phases.

Scope/Boundaries

The scope of this validation includes the assessment of the equipment’s performance in the granulation process, ensuring compliance with regulatory requirements and internal quality standards. The boundaries of this validation extend to the operational parameters defined in the User Requirements Specification (URS).

Executed Protocol List

  • Design Qualification Protocol (DQP)
  • Installation Qualification Protocol (IQP)
  • Operational Qualification Protocol (OQP)
  • Performance Qualification Protocol (PQP)

Deviations Summary

No deviations were noted during the execution of the validation protocols. All activities were performed as per the approved protocols.

CPP Verification Summary

The critical process parameters (CPPs) of speed, time, and bowl clearance were verified during the OQ and PQ phases. All parameters met the acceptance criteria as outlined in the URS.

Conclusion

The validation of the Planetary Mixer (Wet Mass) has been successfully completed. The equipment operates within the defined parameters and meets all specified acceptance criteria. It is recommended for continued use in the production of solid dosage forms.

See also  Multi Mill – DQ Protocol

Attachments Index

  • Attachment 1: Design Qualification Report
  • Attachment 2: Installation Qualification Report
  • Attachment 3: Operational Qualification Report
  • Attachment 4: Performance Qualification Report

Approvals

Prepared by: [Name/Title]

Reviewed by: [Name/Title]

Approved by: [Name/Title]