Peristaltic Pump (Binder Addition) – IQ Protocol

Installation Qualification Protocol for Peristaltic Pump in Solid Dosage Form

Document Number: IQ-OSD-PP-001

Version: 1.0

Effective Date: [Insert Date]

Prepared by: [Insert Name]

Approved by: [Insert Name]

Objective

The objective of this Installation Qualification (IQ) protocol is to verify that the Peristaltic Pump is installed correctly and operates within specified parameters to ensure its suitability for controlled binder dosing in the production of solid dosage forms.

Scope

This protocol applies to the Installation Qualification of the Peristaltic Pump utilized in the Production/Granulation area for direct impact on product quality.

Responsibilities

  • Validation Team: Responsible for the execution and documentation of the IQ protocol.
  • Quality Assurance: Responsible for reviewing and approving the IQ documentation.
  • Maintenance Team: Responsible for ensuring the equipment is installed and maintained according to manufacturer specifications.

Prerequisites

  • Installation of the Peristaltic Pump must be completed prior to executing this protocol.
  • All personnel involved in the execution of this protocol must be trained on the equipment and procedures.

Equipment Description

The Peristaltic Pump is designed for controlled binder dosing in the granulation process of solid dosage forms. It provides precise flow control and is capable of maintaining consistent dosing accuracy and repeatability.

Test Plan

Test ID Procedure Acceptance Evidence
IQ-01 Verify installation according to manufacturer specifications. Installation matches specifications. Installation checklist.
IQ-02 Check electrical connections and grounding. Connections secure and grounded. Electrical inspection report.
IQ-03 Perform flow accuracy test. Flow accuracy within ±5% of target. Flow test results.
IQ-04 Conduct repeatability test. Repeatability within specified limits. Repeatability test results.
See also  Fluid Bed Processor (FBP) - Granulation – Validation Summary Report (VSR) Template

Detailed Test Cases

Test ID: IQ-01

Procedure: Inspect the installation of the Peristaltic Pump against the manufacturer’s specifications.

Acceptance Criteria: Installation matches specifications.

Evidence: Complete the installation checklist and attach to the protocol.

Test ID: IQ-02

Procedure: Verify all electrical connections and grounding.

Acceptance Criteria: Connections are secure and properly grounded.

Evidence: Document findings in the electrical inspection report.

Test ID: IQ-03

Procedure: Measure flow accuracy using calibrated flow meters.

Acceptance Criteria: Flow accuracy must be within ±5% of the target flow rate.

Evidence: Attach flow test results to the protocol.

Test ID: IQ-04

Procedure: Conduct a repeatability test over multiple cycles.

Acceptance Criteria: Repeatability must be within specified limits.

Evidence: Document results of the repeatability test.

Deviations

Any deviations from the acceptance criteria must be documented and investigated. A report must be generated to determine the impact on product quality and compliance.

Approvals

All sections of this protocol must be reviewed and approved by the Validation Team and Quality Assurance before implementation.