Objective
The objective of this Installation Qualification (IQ) protocol is to verify that the Spheronizer/Marumerizer is installed correctly and operates according to the specified requirements, ensuring compliance with regulatory standards.
Scope
This protocol applies to the Spheronizer/Marumerizer used in the production of solid dosage forms (OSD) within the production area for pellet manufacturing.
Responsibilities
- Validation Team: Responsible for executing the IQ protocol and documenting results.
- Quality Assurance: Responsible for reviewing and approving the IQ documentation.
- Maintenance Team: Responsible for ensuring equipment is installed and maintained properly.
Prerequisites
- Equipment installation must be completed prior to executing this protocol.
- All relevant documentation (URS, design specifications) must be available.
- Personnel must be trained on the operation of the Spheronizer/Marumerizer.
Equipment Description
The Spheronizer/Marumerizer is designed for the spheronization of pellets, providing a uniform particle size distribution and shape. Key critical parameters include plate speed, time, and particle size distribution (PSD) shape.
Test Plan
| Test ID | Procedure | Acceptance Criteria | Evidence |
|---|---|---|---|
| IQ-01 | Verify equipment installation against the URS. | All components installed as per specifications. | Installation checklist |
| IQ-02 | Check calibration of critical parameters. | Calibration within specified limits. | Calibration certificates |
| IQ-03 | Test operation of the Spheronizer/Marumerizer. | Equipment operates without errors. | Operational log |
Detailed Test Cases
Test Case IQ-01
Objective: Verify equipment installation against the URS.
Procedure: Review the installation checklist and confirm all components are installed.
Acceptance Criteria: All components installed as per specifications.
Evidence: Signed installation checklist.
Test Case IQ-02
Objective: Check calibration of critical parameters.
Procedure: Review calibration records for plate speed, time, and PSD shape.
Acceptance Criteria: Calibration within specified limits.
Evidence: Calibration certificates.
Test Case IQ-03
Objective: Test operation of the Spheronizer/Marumerizer.
Procedure: Run the equipment and monitor for any errors or malfunctions.
Acceptance Criteria: Equipment operates without errors.
Evidence: Operational log.
Deviations
Any deviations from the acceptance criteria must be documented and investigated. A deviation report must be submitted to the Quality Assurance team for review and approval.
Approvals