V Blender – OQ Protocol

Operational Qualification Protocol for V Blender in Solid Dosage Form Production

Document Control:

  • Document Number: OQ-001
  • Revision Number: 1.0
  • Effective Date: [Insert Date]
  • Prepared By: [Insert Name]
  • Approved By: [Insert Name]

Objective

The objective of this protocol is to establish the operational qualification of the V Blender used for blending powders and granules in the production of solid dosage forms.

Scope

This protocol applies to the V Blender located in the production area, specifically for blending operations impacting product quality directly.

Responsibilities

  • Validation Team: Responsible for executing the protocol and documenting results.
  • Quality Assurance: Responsible for reviewing and approving the protocol and results.
  • Production Personnel: Responsible for operating the V Blender as per the protocol.

Prerequisites

  • Completion of Installation Qualification (IQ).
  • Training of personnel on the operation of the V Blender.
  • Availability of all necessary materials and equipment for testing.

Equipment Description

The V Blender is a cylindrical blending machine designed for the uniform mixing of powders and granules. It operates by rotating at specified RPMs to achieve homogeneity in the blend.

Test Plan

Test ID Procedure Acceptance Evidence
OQ-01 Verify RPM settings during operation. RPM must be within specified range. Calibration logs, RPM measurement records.
OQ-02 Check fill level of materials in the blender. Fill level must meet specified criteria. Visual inspection records, photographs.
OQ-03 Measure blending time against defined parameters. Blending time must meet acceptance criteria. Time logs, blending batch records.
See also  Centrifugal Sifter – DQ Protocol

Detailed Test Cases

Test Case OQ-01: RPM Verification

Procedure: Set the V Blender to the specified RPM and measure using a calibrated RPM meter.

Acceptance Criteria: RPM must be within ±5% of the specified setting.

Evidence: Documented RPM readings and calibration certificate of the measuring device.

Test Case OQ-02: Fill Level Check

Procedure: Fill the V Blender with the specified quantity of material and visually inspect the fill level.

Acceptance Criteria: Fill level must be between 50% and 80% of the blender’s capacity.

Evidence: Photographs and inspection logs documenting fill levels.

Test Case OQ-03: Blending Time Measurement

Procedure: Start the blending process and time the operation until the specified blending time is reached.

Acceptance Criteria: Blending must occur for the specified duration as per the URS.

Evidence: Time logs and blending batch records.

Deviations

Any deviations from the acceptance criteria must be documented and investigated. A corrective action plan should be developed to address the root cause of the deviation.

Approvals

Prepared by: ___________________ Date: ___________

Approved by: ___________________ Date: ___________