Loss-in-Weight Feeder – DQ Protocol

Document Number: DQ-OSD-LIW-001

Version: 1.0

Date: 2023-10-01

Prepared by: Validation Team

Approved by: QA Manager

Design Qualification Protocol for Loss-in-Weight Feeder

This document outlines the Design Qualification (DQ) protocol for the Loss-in-Weight Feeder used in the production of solid dosage forms.

Objective:

The objective of this DQ protocol is to ensure that the Loss-in-Weight Feeder is designed and installed in accordance with specified requirements and is suitable for its intended use in accurate powder feeding.

Scope:

This protocol applies to the Loss-in-Weight Feeder utilized in the production/continuous manufacturing area for solid dosage forms where it has a direct impact on product quality.

Responsibilities:

  • Validation Team: Responsible for executing the DQ protocol and documenting results.
  • Quality Assurance (QA): Responsible for reviewing and approving the DQ protocol and results.
  • Engineering: Responsible for providing technical specifications and support during the qualification process.

Prerequisites:

  • Completion of User Requirement Specification (URS) as per Annex 11.
  • Availability of equipment installation and operation manuals.
  • Training of personnel involved in the validation process.

Equipment Description:

The Loss-in-Weight Feeder is designed for accurate powder feeding in continuous manufacturing processes. It utilizes a feed accuracy control loop with alarms to ensure precision in material delivery.

Test ID Procedure Acceptance Criteria Evidence
DQ-001 Verify installation against engineering specifications. All components installed as per specifications. Installation checklist signed off.
DQ-002 Check feed accuracy control loop alarms functionality. Alarms trigger within specified limits. Alarm test log.
DQ-003 Perform data integrity checks on CSV. Data integrity checks pass without errors. Data integrity report.
See also  Bin Dryer (IBC Dryer) – DQ Protocol

Detailed Test Cases:

  1. Test Case ID: DQ-001
  2. Test Description: Verify installation against engineering specifications.

    Expected Result: All components installed as per specifications.

  3. Test Case ID: DQ-002
  4. Test Description: Check feed accuracy control loop alarms functionality.

    Expected Result: Alarms trigger within specified limits.

  5. Test Case ID: DQ-003
  6. Test Description: Perform data integrity checks on CSV.

    Expected Result: Data integrity checks pass without errors.

Deviations:

Any deviations from the acceptance criteria must be documented and assessed for impact on product quality.

Approvals:

___________________________

Validation Team Lead

___________________________

Quality Assurance Manager