Tablet Press (Bilayer/Multilayer) – IQ Protocol

Installation Qualification Protocol for Multilayer Tablet Press

Document Control Number: IQ-TP-001

Version: 1.0

Effective Date: [Insert Date]

Reviewed By: [Insert Name]

Approved By: [Insert Name]

Objective

The objective of this Installation Qualification (IQ) protocol is to verify that the Bilayer/Multilayer Tablet Press is installed correctly and operates according to the specified requirements for producing multilayer tablets.

Scope

This protocol applies to the IQ of the Bilayer/Multilayer Tablet Press used in the production area for Solid Dosage Form (OSD) manufacturing.

Responsibilities

The Validation Team is responsible for executing this protocol, while the Quality Assurance (QA) department will review and approve the results.

Prerequisites

  • Completion of equipment installation
  • Availability of necessary documentation (URS, SOPs)
  • Training of personnel on equipment operation

Equipment Description

The Bilayer/Multilayer Tablet Press is designed to produce multilayer tablets with controlled layer weight and force profile. It is equipped with a PLC for monitoring and control.

Test Plan

Test ID Procedure Acceptance Criteria Evidence
IQ-TP-01 Verify installation of components All components installed per manufacturer specifications Installation checklist
IQ-TP-02 Check electrical connections No loose connections; all indicators functional Electrical inspection report
IQ-TP-03 Test PLC functionality PLC operates without errors; all parameters displayed correctly PLC test report
IQ-TP-04 Layer weight control verification Weight within specified limits as per URS Annex11 Weight measurement logs
IQ-TP-05 Force profile testing Force profile matches specifications Force profile graphs
See also  High Shear Mixer / Homogenizer – Equipment Validation SOP

Detailed Test Cases

Test ID: IQ-TP-01

Procedure: Verify installation of components. Check that all mechanical and electronic components are installed according to the manufacturer’s specifications.

Acceptance Criteria: All components installed per manufacturer specifications.

Evidence: Installation checklist signed by the validation team.

Test ID: IQ-TP-02

Procedure: Inspect all electrical connections for tightness and proper configuration.

Acceptance Criteria: No loose connections; all indicators functional.

Evidence: Electrical inspection report detailing the status of connections.

Test ID: IQ-TP-03

Procedure: Conduct a functionality test of the PLC to ensure all controls and displays are operational.

Acceptance Criteria: PLC operates without errors; all parameters displayed correctly.

Evidence: PLC test report showing operational status.

Test ID: IQ-TP-04

Procedure: Measure layer weights during test runs to confirm they meet specified limits.

Acceptance Criteria: Weight within specified limits as per URS Annex11.

Evidence: Weight measurement logs from test runs.

Test ID: IQ-TP-05

Procedure: Record the force profile during operation and compare it to the specified profile.

Acceptance Criteria: Force profile matches specifications.

Evidence: Force profile graphs generated during testing.

Deviations

Any deviations from the acceptance criteria must be documented and justified in a deviation report.

Approvals

This protocol must be reviewed and approved by the Quality Assurance department prior to execution.