Air Classifier Mill – IQ Protocol

Document Control

Document Number: IQ-ACM-001

Version: 1.0

Effective Date: [Insert Date]

Review Date: [Insert Date]

Prepared by: [Insert Name]

Approved by: [Insert Name]

Installation Qualification Protocol for Air Classifier Mill

Objective: To verify that the Air Classifier Mill is installed correctly and operates according to the specified requirements.

Scope: This protocol applies to the installation of the Air Classifier Mill in the Production/Milling area for controlled fine milling of solid dosage forms.

Responsibilities:

  • Validation Team: Responsible for the execution of the IQ protocol.
  • Quality Assurance: Responsible for the review and approval of the protocol.
  • Engineering: Responsible for the installation of the equipment.

Prerequisites:

  • Completion of Site Preparation
  • Utility Connections Completed
  • Equipment Delivery and Inspection

Equipment Description:

The Air Classifier Mill is designed for controlled fine milling of solid dosage forms, ensuring the desired particle size distribution (PSD) through adjustable classifier speed and airflow.

Test ID Procedure Acceptance Criteria Evidence
IQ-01 Verify installation location and utilities Location matches URS specifications Installation Report
IQ-02 Check equipment alignment and leveling Equipment is level and aligned as per specifications Alignment Report
IQ-03 Confirm utility connections (electric, air, etc.) Utilities are connected as per URS Utility Connection Checklist
IQ-04 Test classifier speed and airflow parameters Classifier speed and airflow meet URS requirements Test Data Report

Detailed Test Cases:

  • Test ID: IQ-01 – Inspect the installation area to ensure compliance with URS specifications.
  • Test ID: IQ-02 – Use a leveling tool to confirm the equipment is properly aligned.
  • Test ID: IQ-03 – Verify utility connections against the approved design documents.
  • Test ID: IQ-04 – Measure classifier speed and airflow using calibrated instruments.
See also  Drum Tippler/Drum Tumbler – Qualification Certificate Template

Deviations:

Any deviations from the acceptance criteria must be documented, investigated, and resolved before the equipment can be approved for use.

Approvals:

Prepared by: ______________________ Date: ___________

Approved by: ______________________ Date: ___________