Operational Qualification Protocol for Auto Coating Pan (Perforated Pan Coater)

Objective: To validate the operational performance of the Auto Coating Pan (Perforated Pan Coater) for film coating in solid dosage forms.

Scope: This protocol applies to the Auto Coating Pan used in the Production/Coating area for direct impact on product quality.

Responsibilities:

  • Validation Team: Responsible for executing and documenting the OQ protocol.
  • Quality Assurance: Responsible for reviewing and approving the protocol and results.
  • Production Staff: Responsible for operating the equipment during the qualification process.

Prerequisites:

  • Completion of Installation Qualification (IQ).
  • Availability of all necessary equipment and materials.
  • Training of personnel on the operation of the Auto Coating Pan.

Equipment Description:

The Auto Coating Pan (Perforated Pan Coater) is designed for film coating of solid dosage forms. It operates with critical parameters including inlet/exhaust temperature, spray rate, pan speed, and PLC controls to ensure uniform coating application.

Test ID Procedure Acceptance Criteria Evidence
OQ-01 Verify inlet temperature during operation. Inlet temp within specified range (URS Annex11) Temperature log
OQ-02 Verify exhaust temperature during operation. Exhaust temp within specified range (URS Annex11) Temperature log
OQ-03 Verify spray rate during operation. Spray rate within specified range (URS Annex11) Flow rate log
OQ-04 Verify pan speed during operation. Pan speed within specified range (URS Annex11) Speed log
OQ-05 Verify PLC functionality and settings. PLC settings match defined parameters (URS Annex11) PLC configuration report
See also  Split Butterfly Valve (SBV) Transfer System – DQ Protocol

Detailed Test Cases:

  • Test ID: OQ-01
    • Procedure: Monitor inlet temperature during operation.
    • Acceptance Criteria: Inlet temperature must be within the specified range in URS Annex11.
    • Evidence: Record and log temperature readings for validation.
  • Test ID: OQ-02
    • Procedure: Monitor exhaust temperature during operation.
    • Acceptance Criteria: Exhaust temperature must be within the specified range in URS Annex11.
    • Evidence: Record and log temperature readings for validation.
  • Test ID: OQ-03
    • Procedure: Measure the spray rate during operation.
    • Acceptance Criteria: Spray rate must be within the specified range in URS Annex11.
    • Evidence: Record flow rate data for validation.
  • Test ID: OQ-04
    • Procedure: Measure the pan speed during operation.
    • Acceptance Criteria: Pan speed must be within the specified range in URS Annex11.
    • Evidence: Record speed data for validation.
  • Test ID: OQ-05
    • Procedure: Verify PLC settings and functionality.
    • Acceptance Criteria: PLC settings must match defined parameters in URS Annex11.
    • Evidence: Document PLC configuration report.

Deviations: Any deviations from the acceptance criteria must be documented and investigated as per the deviation management procedure.

Approvals:

  • Validation Team Lead: ______________________ Date: __________
  • Quality Assurance Manager: ______________________ Date: __________

Data Integrity Checks:

  • Ensure all data logs are timestamped and signed by the operator.
  • Perform regular audits of data entries against raw data.
  • Implement electronic data capture with access controls to prevent unauthorized changes.