Objective
The objective of this Design Qualification (DQ) protocol is to ensure that the Bin Lifter / IBC Lifter is designed and installed to meet the specified requirements for IBC handling and docking in the Production/Material Handling area.
Scope
This protocol applies to the validation of the Bin Lifter / IBC Lifter used in the Solid Dosage Form manufacturing process, focusing on its critical parameters and compliance with the User Requirement Specification (URS).
Responsibilities
- Validation Team: Responsible for executing the DQ protocol and documenting results.
- Quality Assurance: Responsible for reviewing and approving the protocol.
- Engineering Team: Responsible for providing necessary documentation and support during the qualification process.
Prerequisites
- Completion of the User Requirement Specification (URS).
- Installation of the Bin Lifter / IBC Lifter in the designated area.
- Training of personnel on equipment operation and safety procedures.
Equipment Description
The Bin Lifter / IBC Lifter is designed for handling Intermediate Bulk Containers (IBCs) in the production area. It features a load capacity that meets operational requirements and ensures proper docking alignment for efficient material handling.
Test Plan
| Test ID | Procedure | Acceptance Criteria | Evidence |
|---|---|---|---|
| DQ-01 | Verify load capacity during operation. | Load capacity meets specifications as per URS. | Load test report. |
| DQ-02 | Check docking alignment with IBC. | Alignment within acceptable tolerance limits. | Visual inspection report. |
Detailed Test Cases
Test Case DQ-01: Load Capacity Verification
Objective: To confirm that the Bin Lifter / IBC Lifter can handle the specified load capacity.
Procedure: Load the Bin Lifter / IBC Lifter with the maximum specified weight and operate through the full range of motion.
Acceptance Criteria: The equipment must operate without failure and maintain stability under load.
Evidence: Documented load test results and stability observations.
Test Case DQ-02: Docking Alignment Check
Objective: To ensure proper alignment during IBC docking.
Procedure: Position the IBC and check alignment visually and with measuring tools.
Acceptance Criteria: The alignment must fall within the tolerance limits defined in the URS.
Evidence: Visual inspection report and measurement data.
Deviations
Any deviations from the acceptance criteria must be documented and investigated. Corrective actions should be implemented as necessary and re-testing conducted to ensure compliance.
Approvals
This Design Qualification Protocol requires approval from the following parties:
- Validation Team Lead: ____________________
- Quality Assurance Manager: ____________________
- Engineering Manager: ____________________