Calibration Documents: Peristaltic Pump Flow Calibration (CAL-0215)
| Asset ID | CAL-0215 |
|---|---|
| Equipment | Peristaltic Pump Flow Calibration |
| Equipment Type | Peristaltic Pump |
| Department | Production |
| Area/Location | Aseptic Filling |
| Process Use | Flow |
| Parameter | Flow |
| Units | mL/min |
| Range Min | 0 |
| Range Max | 500 |
| Acceptance Criteria | ±2% |
| Calibration Frequency (days) | 180 |
| Calibration Type | In-house |
| Traceability | ISO17025 |
Table of Contents
Calibration SOP
1. Purpose
The calibration of the Peristaltic Pump Flow Calibration is performed to ensure the accuracy of flow measurements, which is critical for maintaining patient safety, ensuring batch quality, and preserving data integrity. Accurate flow measurements prevent deviations that could compromise product quality and regulatory compliance.
2. Scope
- Asset ID: CAL-0215
- Equipment Name/Type: Peristaltic Pump
- Department/Area: Production / Aseptic Filling
- Process Use: Flow
- Parameter: Flow
- Range: 0 – 500 mL/min
- Units: mL/min
- Calibration Frequency: 180 days
3. Definitions
- Calibration: The process of comparing a measurement instrument to a known standard to ensure accuracy.
- Verification: The process of confirming that a measurement instrument meets specified requirements.
- Adjustment: The act of modifying a measurement instrument to bring it into compliance with specifications.
- As Found: The condition of the instrument prior to any adjustments being made.
- As Left: The condition of the instrument after adjustments have been made.
- OOT (Out of Tolerance): A condition where the measurement falls outside the defined acceptance criteria.
- Drift: The gradual change in a measurement instrument’s output over time.
- Traceability: The ability to verify the history, location, or application of an item by means of documented recorded identification.
- Measurement Uncertainty: A parameter that characterizes the dispersion of the values attributed to a measured quantity.
- Intermediate Check: A verification process conducted between calibrations to ensure ongoing accuracy.
4. References
- Company Metrology SOP [TBD]
- ISO/IEC 17025 traceability via calibration certificates
- ALCOA+ principles
5. Responsibilities
- Technician/Metrology: Perform calibration and maintain records.
- QC/QA Reviewer: Review calibration results and documentation.
- Owner Department: Ensure equipment is available and in good condition for calibration.
- External Service Provider: [TBD] (if applicable)
6. Safety & Preconditions
- Ensure environmental controls are in place (temperature, humidity).
- Allow equipment to warm-up and stabilize as per manufacturer guidelines.
- Maintain cleanliness of the equipment and surrounding area.
- Verify equipment is level and stable.
- Check power supply for proper voltage and stability.
7. Standards & Tools
- Reference Standards Required: [TBD]
- Traceability Statement: ISO17025
- Certificate Validity Check: Ensure all reference standards are within their validity period.
- Standard ID Placeholders: [TBD]
8. Calibration Strategy
Calibration will follow the As Found and As Left logic. The minimum number of test points will be five, including endpoints and midpoints, across the specified range of 0 to 500 mL/min. It is recommended to take three replicate readings at each point to ensure accuracy.
9. Step-by-Step Procedure
- Preparation: Gather all necessary tools and reference standards.
- Stabilization: Allow the pump to stabilize at operating conditions.
- As Found Checks and Data Capture: Measure flow at defined points and record data contemporaneously (ALCOA+).
- Adjustment Rules: If any measurement is OOT, follow adjustment protocols; if not allowed, escalate to QA.
- As Left Verification: Measure flow again to confirm adjustments are within specifications.
- Labeling + Documentation Completion: Complete all required documentation and label the equipment accordingly.
10. Acceptance Criteria & Calculations
The acceptance criteria for this calibration is ±2%. The error calculation formula is:
Error (%) = (Observed Value – True Value) / True Value × 100
Pass/Fail Logic: If the error is within ±2%, the calibration passes; otherwise, it fails.
Rounding Rule Placeholder: [TBD]
11. Handling OOT / Failures
- Immediate containment: Tag equipment and cease use.
- Notification & deviation initiation: Notify QA and document the deviation.
- Impact Assessment Trigger: Define impact window and review affected results/batches.
- Recalibration after repair/adjustment: Ensure recalibration is performed post-adjustment.
- QA Disposition Placeholders: [TBD]
12. Records & Retention
- Logbook entries: Document all calibration activities.
- Calibration report/certificate filing: Maintain records as per company policy.
- E-records if applicable: [TBD]
- Label Content Requirements: Include calibrated date, due date, technician name, and status.
13. Annexures
Annexure A: Calibration Data Sheet
| Test Points | Reference | Observed | Error | Acceptance | Pass/Fail | As Found | As Left |
|---|---|---|---|---|---|---|---|
| [TBD] | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] |
Annexure B: Quick Checklist
- Environmental controls verified
- Equipment warm-up completed
- Cleanliness confirmed
- Leveling checked
- Power supply verified
Annexure C: Example Label Text
Calibration Date: [TBD]
Due Date: [TBD]
Calibrated By: [TBD]
Status: [TBD]
Calibration Protocol
Calibration Protocol
| Protocol ID | Asset ID | Equipment Name | Equipment Type | Dept | Area | Process Use | Parameter | Units | Range | Acceptance Criteria | Frequency | Calibration Type | Traceability |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| [TBD] | CAL-0215 | Peristaltic Pump Flow Calibration | Peristaltic Pump | Production | Aseptic Filling | Flow | Flow | mL/min | 0 – 500 | ±2% | 180 days | In-house | ISO17025 |
Environmental Conditions
Temperature: [TBD]
Relative Humidity: [TBD]
Vibration: [TBD]
Drafts: [TBD]
Test Point Selection
- Minimum: 0 mL/min
- 25% of Range: 125 mL/min
- 50% of Range: 250 mL/min
- 75% of Range: 375 mL/min
- Maximum: 500 mL/min
Results Table
| Test Point | Ref Value | Observed (As Found) | Error | Limit | Pass/Fail | Observed (As Left) | Error | Pass/Fail |
|---|---|---|---|---|---|---|---|---|
| 0 mL/min | [TBD] | [TBD] | [TBD] | ±2% | [TBD] | [TBD] | [TBD] | [TBD] |
| 125 mL/min | [TBD] | [TBD] | [TBD] | ±2% | [TBD] | [TBD] | [TBD] | [TBD] |
| 250 mL/min | [TBD] | [TBD] | [TBD] | ±2% | [TBD] | [TBD] | [TBD] | [TBD] |
| 375 mL/min | [TBD] | [TBD] | [TBD] | ±2% | [TBD] | [TBD] | [TBD] | [TBD] |
| 500 mL/min | [TBD] | [TBD] | [TBD] | ±2% | [TBD] | [TBD] | [TBD] | [TBD] |
Stepwise Instructions
- Preparation: Ensure the peristaltic pump is clean and calibrated equipment is available.
- Stabilization: Allow the pump to stabilize for [TBD] minutes before taking measurements.
- Performing Readings: Take three replicate readings at each test point.
- Calculating Error: Calculate the error for each reading using the formula: Error = (Observed – Ref Value) / Ref Value * 100.
- Evaluation: Compare the calculated errors against the acceptance criteria of ±2%.
- Documentation: Record all observations in the results table and ensure data integrity (ALCOA+).
Deviation Instruction for OOT
If any reading is outside the acceptance criteria:
- Stop use of the equipment.
- Notify the supervisor immediately.
- Open a deviation report.
- Quarantine the impacted results window: [TBD].
- Await QA decision on further actions.
Approvals
| Prepared | Reviewed | Approved |
|---|---|---|
| [Signature/Date] | [Signature/Date] | [Signature/Date] |
Calibration Checklist
| Asset ID | Equipment | Dept | Area | Parameter | Range | Acceptance | Frequency | Traceability |
|---|---|---|---|---|---|---|---|---|
| CAL-0215 | Peristaltic Pump Flow Calibration | Production | Aseptic Filling | Flow | 0 – 500 mL/min | ±2% | 180 days | ISO17025 |
Pre-calibration
- [ ] Verify environmental conditions are within specifications
- [ ] Allow equipment to warm up as per SOP
- [ ] Clean equipment as per cleaning procedure
- [ ] Level the equipment properly
- [ ] Check validity of reference standards
- [ ] Ensure logbook is ready for entries
As Found Execution
- [ ] Set the flow rate to specified setpoints
- [ ] Perform repeat measurements as required
- [ ] Record all raw data accurately
- [ ] Perform necessary calculations for results
OOT Immediate Actions
- [ ] Tag out the equipment
- [ ] Stop use of the equipment immediately
- [ ] Notify relevant personnel
- [ ] Document deviation in the logbook
- [ ] Trigger impact review process
As Left Verification
- [ ] Conduct post-adjustment checks
- [ ] Confirm all results are within acceptance limits
Documentation & Closure
- [ ] Update equipment label with calibration details
- [ ] Attach calibration certificate to documentation
- [ ] Obtain reviewer sign-off
- [ ] Update next due date in logbook
Data Integrity (ALCOA+): Ensure all data is attributable, legible, contemporaneous, original, and accurate.
Deviation Impact Assessment
| Event Summary |
|---|
|
Asset: CAL-0215 – Peristaltic Pump Flow Calibration Date: [TBD] Discovered By: [TBD] Document References: [TBD] As Found Results Summary: [TBD] |
Immediate Containment Checklist
- Stop use of the equipment
- Label/tag the equipment as out of service
- Segregate impacted work
Define Impact Window
Last known in-tolerance date: [TBD] to discovery date: [TBD]
Product/Batch/Test Impact Review
| Batch/Study/Report ID | Results Potentially Impacted | Re-test/Re-weigh Decision |
|---|---|---|
| [TBD] | [TBD] | [TBD] |
Data Integrity Review Prompts (ALCOA+)
- Attributable: [TBD]
- Legible: [TBD]
- Contemporaneous: [TBD]
- Original: [TBD]
- Accurate: [TBD]
- Complete: [TBD]
- Consistent: [TBD]
- Enduring: [TBD]
- Available: [TBD]
Risk Assessment
| Severity | Probability | Detectability | Rationale | Overall Risk |
|---|---|---|---|---|
| [TBD] | [TBD] | [TBD] | [TBD] | [TBD] |
Investigation Summary
Root Cause: [TBD]
CAPA Plan
| Action | Owner | Due Date | Effectiveness Check |
|---|---|---|---|
| [TBD] | [TBD] | [TBD] | [TBD] |
QA Disposition
Release/Hold/Retest/Recall Triggers: [TBD]
Calibration Certificate
Certificate No: [TBD]
Date: [TBD]
Next Due Date: [TBD]
Asset Details
| Asset ID | Equipment Name | Equipment Type | Dept | Area | Make/Model | Serial No | Location | Parameter/Range/Units | Acceptance Criteria |
|---|---|---|---|---|---|---|---|---|---|
| CAL-0215 | Peristaltic Pump Flow Calibration | Peristaltic Pump | Production | Aseptic Filling | [TBD] | [TBD] | [TBD] | Flow: 0 – 500 mL/min | ±2% |
Conditions
Environment: [TBD]
Reference Standards
| Standard Name/ID | Certificate No | Due Date | Traceability Statement |
|---|---|---|---|
| [TBD] | [TBD] | [TBD] | ISO17025 |
Results
As Found Results
| Test Point | Measured Value (mL/min) | Pass/Fail |
|---|---|---|
| 0 | [TBD] | [TBD] |
| 100 | [TBD] | [TBD] |
| 200 | [TBD] | [TBD] |
| 300 | [TBD] | [TBD] |
| 400 | [TBD] | [TBD] |
As Left Results
| Test Point | Measured Value (mL/min) | Pass/Fail |
|---|---|---|
| 0 | [TBD] | [TBD] |
| 100 | [TBD] | [TBD] |
| 200 | [TBD] | [TBD] |
| 300 | [TBD] | [TBD] |
| 400 | [TBD] | [TBD] |
Measurement Uncertainty Statement: [TBD]
Statement of Conformity: [Pass/Fail overall]
Remarks: [TBD]
Signatures
Performed by: ____________________ Date: ____________
Checked by: ______________________ Date: ____________
Approved by: _____________________ Date: ____________