Pressure Gauge 0-16 bar (CAL-0072) – Calibration Documents

Calibration Documents: Pressure Gauge 0-16 bar (CAL-0072)

Asset ID CAL-0072
Equipment Pressure Gauge 0-16 bar
Equipment Type Pressure Gauge
Department Utilities
Area/Location Boiler/Steam
Process Use Steam pressure
Parameter Pressure
Units bar
Range Min 0
Range Max 16
Acceptance Criteria ±1%
Calibration Frequency (days) 365
Calibration Type External
Traceability ISO17025

Calibration SOP

1. Purpose

The calibration of the Pressure Gauge 0-16 bar is performed to ensure accurate measurement of steam pressure within the Boiler/Steam area. This calibration controls risks related to accuracy, patient safety, batch quality, and data integrity, thereby ensuring compliance with Good Manufacturing Practices (GMP).

2. Scope

  • Asset ID: CAL-0072
  • Equipment Name/Type: Pressure Gauge 0-16 bar / Pressure Gauge
  • Department/Area: Utilities / Boiler/Steam
  • Process Use: Steam pressure
  • Parameter: Pressure
  • Range: 0 – 16 bar
  • Units: bar
  • Calibration Frequency: 365 days

3. Definitions

  • Calibration: The process of comparing a measurement instrument against a standard to determine its accuracy.
  • Verification: The process of confirming that a measurement instrument meets specified requirements.
  • Adjustment: The process of modifying a measurement instrument to bring it into compliance with specifications.
  • As Found: The condition of the instrument prior to any adjustments made during calibration.
  • As Left: The condition of the instrument after adjustments have been made and verified.
  • OOT (Out of Tolerance): A condition where the measurement falls outside the specified acceptance criteria.
  • Drift: The gradual change in a measurement instrument’s output over time.
  • Traceability: The ability to verify the history, location, or application of an item by means of documented recorded identification.
  • Measurement Uncertainty: A parameter that characterizes the range of values within which the true value of a measurement lies.
  • Intermediate Check: A verification process performed between calibrations to ensure continued accuracy.

4. References

  • Company Metrology SOP [TBD]
  • ISO/IEC 17025 traceability via calibration certificates
  • ALCOA+ principles

5. Responsibilities

  • Technician/Metrology: Perform calibration and document results.
  • QC/QA Reviewer: Review calibration documentation and results.
  • Owner Department: Ensure equipment is available for calibration.
  • External Service Provider: Conduct calibration as per external calibration type.

6. Safety & Preconditions

  • Environmental controls: Ensure the calibration area is clean and free from contaminants.
  • Warm-up/Stabilization: Allow the pressure gauge to stabilize before calibration.
  • Cleanliness: Ensure the equipment is clean and free from any obstructions.
  • Leveling: Confirm the pressure gauge is properly leveled.
  • Power Supply Checks: Verify that the power supply is stable and within required specifications.
See also  Volumetric Flask 25 mL (CAL-0033) - Calibration Documents

7. Standards & Tools

  • Reference Standards Required: Calibration standards that are traceable to ISO17025.
  • Traceability Statement: Calibration will be performed using standards traceable to ISO17025.
  • Certificate Validity Check: Ensure calibration certificates are valid and up-to-date.
  • Standard ID Placeholders: [TBD]

8. Calibration Strategy

The calibration will follow the As Found and As Left logic:

  • Minimum number of points: At least 5 points including endpoints (0 bar, 16 bar) and midpoints (8 bar).
  • Replicate readings: Perform 3 repeats at each point as a best practice.

9. Step-by-Step Procedure

  1. Preparation: Gather all necessary tools and reference standards.
  2. Stabilization: Allow the pressure gauge to stabilize at room temperature.
  3. As Found checks and data capture: Record initial readings at defined points.
  4. Adjustment rules: If OOT is found, adjust the gauge as permitted; otherwise, escalate to QA.
  5. As Left verification: Confirm that the gauge is within tolerance after adjustments.
  6. Labeling + documentation completion: Complete all necessary documentation and label the equipment.

Explicit instruction: Record raw observations contemporaneously to ensure data integrity (ALCO+).

10. Acceptance Criteria & Calculations

Acceptance criteria: ±1%

Error calculation formula: Error (%) = (Measured Value – True Value) / True Value × 100

Pass/Fail Logic: If error is within ±1%, the calibration passes; otherwise, it fails.

Rounding rule placeholder: [TBD]

11. Handling OOT / Failures

  • Immediate containment: Tag equipment and stop use until resolved.
  • Notification & deviation initiation: Notify QA and initiate a deviation report.
  • Impact assessment trigger: Define impact window and review of affected results/batches.
  • Recalibration after repair/adjustment: Schedule recalibration after any adjustments.
  • QA disposition placeholders: [TBD]

12. Records & Retention

  • Logbook entries: Document all calibration activities in the logbook.
  • Calibration report/certificate filing: Maintain records of calibration certificates.
  • e-Records if applicable: [TBD]
  • Label content requirements: Include calibrated date, due date, technician name, and status.

13. Annexures

Annexure A: Calibration Data Sheet table (test points, ref, observed, error, acceptance, pass/fail; include As Found + As Left columns)

Annexure B: Quick checklist

Annexure C: Example label text (with [TBD] placeholders)

⬆ Back to TOC


Calibration Protocol

Calibration Protocol

Protocol ID Asset ID Equipment Name Equipment Type Dept Area Process Use Parameter Units Range Acceptance Criteria Frequency Calibration Type Traceability
[TBD] CAL-0072 Pressure Gauge 0-16 bar Pressure Gauge Utilities Boiler/Steam Steam pressure Pressure bar 0 – 16 ±1% 365 days External ISO17025
See also  Tachometer (CAL-0263) - Calibration Documents

Environmental Conditions

Temperature: [TBD]

Relative Humidity: [TBD]

Vibration: [TBD]

Drafts: [TBD]

Test Point Selection

Test points will be selected based on the following range:

  • Min: 0 bar
  • 25%: 4 bar
  • 50%: 8 bar
  • 75%: 12 bar
  • Max: 16 bar

Results Table

Test Point Ref Value Observed (As Found) Error Limit Pass/Fail Observed (As Left) Error Pass/Fail
0 bar 0 bar [TBD] [TBD] ±0.01 bar [TBD] [TBD] [TBD] [TBD]
4 bar 4 bar [TBD] [TBD] ±0.04 bar [TBD] [TBD] [TBD] [TBD]
8 bar 8 bar [TBD] [TBD] ±0.08 bar [TBD] [TBD] [TBD] [TBD]
12 bar 12 bar [TBD] [TBD] ±0.12 bar [TBD] [TBD] [TBD] [TBD]
16 bar 16 bar [TBD] [TBD] ±0.16 bar [TBD] [TBD] [TBD] [TBD]

Stepwise Instructions

  1. Preparation: Ensure the pressure gauge is clean and free from any obstructions.
  2. Stabilization: Allow the gauge to stabilize at room temperature for at least 30 minutes.
  3. Performing Readings: Take three replicate readings at each test point.
  4. Calculating Error: Calculate the error for each reading as: Error = Observed – Ref Value.
  5. Evaluation: Compare the calculated errors against the acceptance criteria.
  6. Documentation: Record all observations, calculations, and results in the results table.

Deviation Instruction for OOT

  • Stop use of the pressure gauge immediately.
  • Notify the QA department of the out-of-tolerance condition.
  • Open a deviation report for the incident.
  • Quarantine the impacted results window: [TBD].
  • Await QA decision on further actions.

Approvals

Prepared By Reviewed By Approved By
[Signature/Date] [Signature/Date] [Signature/Date]

⬆ Back to TOC


Calibration Checklist

Asset ID Equipment Dept Area Parameter Range Acceptance Frequency Traceability
CAL-0072 Pressure Gauge 0-16 bar Utilities Boiler/Steam Pressure 0 – 16 bar ±1% 365 days ISO17025

Pre-calibration

  • [ ] Verify environmental conditions are within specified limits
  • [ ] Ensure equipment has warmed up as per manufacturer’s guidelines
  • [ ] Clean the equipment as necessary
  • [ ] Level the equipment if applicable
  • [ ] Confirm validity of reference standards
  • [ ] Ensure calibration logbook is ready for entries

As Found Execution

  • [ ] Set the gauge to specified setpoints
  • [ ] Perform repeat measurements as required
  • [ ] Record all raw data accurately
  • [ ] Perform necessary calculations for results

OOT Immediate Actions

  • [ ] Tag out the equipment
  • [ ] Stop use of the equipment immediately
  • [ ] Notify relevant personnel
  • [ ] Document deviation from acceptance criteria
  • [ ] Trigger impact review as necessary
See also  Load Cell (Bin blender) (CAL-0012) - Calibration Documents

As Left Verification

  • [ ] Conduct post-adjustment checks
  • [ ] Confirm all measurements are within specified limits

Documentation & Closure

  • [ ] Update equipment label with calibration details
  • [ ] Attach calibration certificate to logbook
  • [ ] Obtain reviewer sign-off
  • [ ] Update next due date for calibration

Data Integrity (ALCOA+): Ensure all data is Attributable, Legible, Contemporaneous, Original, Accurate, and Complete.

⬆ Back to TOC


Deviation Impact Assessment

Event Summary
Asset: Pressure Gauge 0-16 bar
Date: [TBD]
Discovered By: [TBD]
Document References: [TBD]
As Found Results Summary: [TBD]

Immediate Containment Checklist

  • Stop use of the asset
  • Label/Tag the asset as out of service
  • Segregate impacted work

Define Impact Window

Last known in-tolerance date: [TBD] to discovery date: [TBD]

Product/Batch/Test Impact Review

Batch/Study/Report ID Results Potentially Impacted Re-test/Re-weigh Decision
[TBD] [TBD] [TBD]

Data Integrity Review Prompts (ALCOA+)

  • Attributable: [TBD]
  • Legible: [TBD]
  • Contemporaneous: [TBD]
  • Original: [TBD]
  • Accurate: [TBD]
  • Complete: [TBD]
  • Consistent: [TBD]
  • Enduring: [TBD]
  • Available: [TBD]

Risk Assessment

Severity Probability Detectability Rationale Overall Risk
[TBD] [TBD] [TBD] [TBD] [TBD]

Investigation Summary

Investigation Summary Placeholders: [TBD]

Root Cause: [TBD]

CAPA Plan

Action Owner Due Date Effectiveness Check
[TBD] [TBD] [TBD] [TBD]

QA Disposition

Release/Hold/Retest/Recall Triggers: [TBD]

⬆ Back to TOC


Calibration Certificate

Certificate No: [TBD]

Date: [TBD]

Next Due Date: [TBD]

Asset Details

Asset ID Equipment Name Equipment Type Dept Area Make/Model Serial No Location Parameter/Range/Units Acceptance Criteria
CAL-0072 Pressure Gauge 0-16 bar Pressure Gauge Utilities Boiler/Steam [TBD] [TBD] [TBD] Pressure / 0-16 / bar ±1%

Conditions

Environment: [TBD]

Reference Standards

Standard Name/ID Certificate No Due Date Traceability Statement
[TBD] [TBD] [TBD] Traceability: ISO17025

Results

As Found Results

Test Point Measured Value (bar) Acceptance Criteria Pass/Fail
0 [TBD] ±1% [TBD]
4 [TBD] ±1% [TBD]
8 [TBD] ±1% [TBD]
12 [TBD] ±1% [TBD]
16 [TBD] ±1% [TBD]

As Left Results

Test Point Measured Value (bar) Acceptance Criteria Pass/Fail
0 [TBD] ±1% [TBD]
4 [TBD] ±1% [TBD]
8 [TBD] ±1% [TBD]
12 [TBD] ±1% [TBD]
16 [TBD] ±1% [TBD]

Measurement Uncertainty Statement: [TBD]

Statement of Conformity: [TBD]

Remarks: [TBD]

Signatures

Performed by: ____________________ Date: __________

Checked by: ____________________ Date: __________

Approved by: ____________________ Date: __________

⬆ Back to TOC