Calibration Documents: Sterile Vial Filler Fill Volume (CAL-0214)
| Asset ID | CAL-0214 |
|---|---|
| Equipment | Sterile Vial Filler Fill Volume |
| Equipment Type | Filling Machine |
| Department | Production |
| Area/Location | Aseptic Filling |
| Process Use | Fill volume |
| Parameter | Volume |
| Units | mL |
| Range Min | 0 |
| Range Max | 50 |
| Acceptance Criteria | ±1% |
| Calibration Frequency (days) | 180 |
| Calibration Type | In-house |
| Traceability | ISO17025 |
Table of Contents
Calibration SOP
1. Purpose
The calibration of the Sterile Vial Filler Fill Volume is performed to ensure accurate fill volumes, which is critical for patient safety and batch quality. Accurate calibration controls the risk of underfilling or overfilling, thereby maintaining compliance with regulatory standards and ensuring data integrity throughout the production process.
2. Scope
- Asset ID: CAL-0214
- Equipment Name: Sterile Vial Filler Fill Volume
- Equipment Type: Filling Machine
- Department/Area: Production / Aseptic Filling
- Process Use: Fill volume
- Parameter: Volume
- Range: 0 – 50 mL
- Units: mL
- Calibration Frequency: 180 days
3. Definitions
- Calibration: The process of configuring an instrument to provide a result for a sample within an acceptable range.
- Verification: The process of confirming that a device is functioning correctly against a standard.
- Adjustment: The act of modifying a device to bring it within specified limits.
- As Found: The condition of the equipment prior to any adjustments being made.
- As Left: The condition of the equipment after adjustments have been made.
- OOT (Out of Tolerance): A condition where the measurement exceeds the defined acceptance criteria.
- Drift: The gradual change in the output of a measurement device over time.
- Traceability: The ability to verify the history, location, or application of an item by means of documented recorded identification.
- Measurement Uncertainty: A parameter associated with the result of a measurement that characterizes the range of values within which the true value is asserted to lie.
- Intermediate Check: A verification step performed between calibrations to ensure ongoing accuracy.
4. References
- Company Metrology SOP [TBD]
- ISO/IEC 17025 traceability via calibration certificates
- ALCOA+ principles
5. Responsibilities
- Technician/Metrology: Perform calibration and document results.
- QC/QA Reviewer: Review calibration results and ensure compliance.
- Owner Department: Ensure equipment is available and maintained.
- External Service Provider: [TBD] (if applicable)
6. Safety & Preconditions
- Ensure environmental controls are in place (temperature, humidity).
- Allow equipment to warm-up and stabilize before calibration.
- Maintain cleanliness of the equipment and surrounding area.
- Check leveling of the equipment.
- Verify power supply is stable and within specifications.
7. Standards & Tools
- Reference standards required: [TBD]
- Traceability statement: ISO17025
- Certificate validity check: [TBD]
- Standard ID placeholders: [TBD]
8. Calibration Strategy
The calibration will follow the As Found and As Left logic:
- Minimum number of points: At least 5 points including endpoints (0 mL and 50 mL) and midpoints (25 mL).
- Replicate readings at each point: 3 repeats as a best practice.
9. Step-by-Step Procedure
- Preparation: Gather all necessary tools and standards.
- Stabilization: Allow the equipment to reach operational conditions.
- As Found checks and data capture: Measure fill volumes at defined points and record results contemporaneously.
- Adjustment rules: If OOT is found, follow adjustment procedures; if not allowed, escalate to QA.
- As Left verification: Confirm that adjustments bring the equipment within tolerance.
- Labeling + documentation completion: Ensure all records are filled out accurately and completely.
10. Acceptance Criteria & Calculations
Acceptance criteria: ±1% of the target fill volume.
Error calculation formula: Error (%) = (Observed Value – Target Value) / Target Value × 100
Pass/Fail logic: If the error is within ±1%, the result is a pass; otherwise, it is a fail.
Rounding rule: [TBD]
11. Handling OOT / Failures
- Immediate containment: Tag equipment and stop use.
- Notification & deviation initiation: Inform QA and document the deviation.
- Impact assessment trigger: Define impact window and review of affected results/batches.
- Recalibration after repair/adjustment: Ensure equipment is recalibrated before returning to service.
- QA disposition placeholders: [TBD]
12. Records & Retention
- Logbook entries: Document all calibration activities.
- Calibration report/certificate filing: Maintain records for audit purposes.
- e-Records if applicable: [TBD]
- Label content requirements: Calibrated date, due date, by whom, status.
13. Annexures
Annexure A: Calibration Data Sheet
| Test Points | Reference | Observed | Error | Acceptance | Pass/Fail | As Found | As Left |
|---|---|---|---|---|---|---|---|
| [TBD] | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] |
Annexure B: Quick Checklist
- Environmental controls verified
- Equipment warmed up
- Cleanliness checked
- Leveling confirmed
- Power supply stable
Annexure C: Example Label Text
Calibration Date: [TBD]
Due Date: [TBD]
Calibrated By: [TBD]
Status: [TBD]
Calibration Protocol
Calibration Protocol
| Protocol ID | Asset ID | Equipment Name | Equipment Type | Dept | Area | Process Use | Parameter | Units | Range | Acceptance Criteria | Frequency | Calibration Type | Traceability |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| [TBD] | CAL-0214 | Sterile Vial Filler Fill Volume | Filling Machine | Production | Aseptic Filling | Fill volume | Volume | mL | 0 – 50 | ±1% | 180 days | In-house | ISO17025 |
Environmental Conditions
Temperature: [TBD] °C
Relative Humidity: [TBD] %
Vibration: [TBD]
Drafts: [TBD]
Test Point Selection
- Minimum: 0 mL
- 25% of Range: 12.5 mL
- 50% of Range: 25 mL
- 75% of Range: 37.5 mL
- Maximum: 50 mL
Results Table
| Test Point | Ref Value | Observed (As Found) | Error | Limit | Pass/Fail | Observed (As Left) | Error | Pass/Fail |
|---|---|---|---|---|---|---|---|---|
| 0 mL | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] |
| 12.5 mL | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] |
| 25 mL | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] |
| 37.5 mL | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] |
| 50 mL | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] | [TBD] |
Stepwise Instructions
- Preparation: Ensure the equipment is clean and calibrated prior to use.
- Stabilization: Allow the equipment to stabilize for [TBD] minutes before taking measurements.
- Performing Readings: Take three replicate measurements at each test point.
- Calculating Error: Calculate the error for each test point using the formula: Error = (Observed – Ref Value) / Ref Value * 100.
- Evaluation: Compare the calculated error against the acceptance criteria of ±1%.
- Documentation: Record all observations in the results table and ensure data integrity (ALCOA+).
Deviation Instruction for OOT
- Stop use of the equipment immediately.
- Notify the supervisor and quality assurance (QA) team.
- Open a deviation report.
- Quarantine impacted results window: [TBD].
- Await QA decision on further actions.
Approvals
| Prepared | Reviewed | Approved |
|---|---|---|
| [Signature/Date] | [Signature/Date] | [Signature/Date] |
Calibration Checklist
| Asset ID | Equipment | Dept | Area | Parameter | Range | Acceptance | Frequency | Traceability |
|---|---|---|---|---|---|---|---|---|
| CAL-0214 | Sterile Vial Filler Fill Volume | Production | Aseptic Filling | Volume | 0 – 50 mL | ±1% | 180 days | ISO17025 |
Pre-calibration
- [ ] Verify environmental conditions are within specifications
- [ ] Ensure equipment has warmed up adequately
- [ ] Clean the equipment as per SOP
- [ ] Level the equipment properly
- [ ] Check validity of reference standards
- [ ] Ensure calibration logbook is ready for entries
As Found Execution
- [ ] Set the initial setpoints
- [ ] Perform repeat measurements
- [ ] Record all raw data accurately
- [ ] Perform necessary calculations
OOT Immediate Actions
- [ ] Tag out the equipment
- [ ] Stop use of the equipment
- [ ] Notify relevant personnel
- [ ] Document deviation
- [ ] Trigger impact review
As Left Verification
- [ ] Conduct post-adjustment checks
- [ ] Confirm all measurements are within acceptance limits
Documentation & Closure
- [ ] Update equipment label
- [ ] Attach calibration certificate
- [ ] Obtain reviewer sign-off
- [ ] Update next due date in logbook
Data Integrity (ALCOA+): Ensure all data recorded is Attributable, Legible, Contemporaneous, Original, and Accurate, with complete traceability.
Deviation Impact Assessment
| Event Summary |
|---|
|
Asset: Sterile Vial Filler Fill Volume Date: [TBD] Discovered By: [TBD] Document References: [TBD] As Found Results Summary: [TBD] |
Immediate Containment Checklist
- Stop use of the asset
- Label/tag the asset as out of tolerance
- Segregate impacted work
Define Impact Window
Last known in-tolerance date: [TBD] to discovery date: [TBD]
Product/Batch/Test Impact Review
| Batch/Study/Report ID | Results Potentially Impacted | Re-test/Re-weigh Decision |
|---|---|---|
| [TBD] | [TBD] | [TBD] |
Data Integrity Review Prompts (ALCOA+)
- Attributable: [TBD]
- Legible: [TBD]
- Contemporaneous: [TBD]
- Original: [TBD]
- Accurate: [TBD]
- Complete: [TBD]
- Consistent: [TBD]
- Enduring: [TBD]
- Available: [TBD]
Risk Assessment
| Severity | Probability | Detectability | Rationale | Overall Risk |
|---|---|---|---|---|
| [TBD] | [TBD] | [TBD] | [TBD] | [TBD] |
Investigation Summary
Root Cause: [TBD]
CAPA Plan
| Action | Owner | Due Date | Effectiveness Check |
|---|---|---|---|
| [TBD] | [TBD] | [TBD] | [TBD] |
QA Disposition
Release/Hold/Retest/Recall Triggers: [TBD]
Calibration Certificate
Certificate No: [TBD]
Date: [TBD]
Next Due Date: [TBD]
Asset Details
| Asset ID | Equipment Name | Equipment Type | Dept | Area | Make/Model | Serial No | Location | Parameter/Range/Units | Acceptance Criteria |
|---|---|---|---|---|---|---|---|---|---|
| CAL-0214 | Sterile Vial Filler Fill Volume | Filling Machine | Production | Aseptic Filling | [TBD] | [TBD] | [TBD] | Volume: 0 – 50 mL | ±1% |
Conditions
Environment: [TBD]
Reference Standards
| Standard Name/ID | Certificate No | Due Date | Traceability Statement |
|---|---|---|---|
| [TBD] | [TBD] | [TBD] | ISO17025 |
Results
As Found Results
| Test Point | Measured Value (mL) | Remarks |
|---|---|---|
| 1 | [TBD] | [TBD] |
| 2 | [TBD] | [TBD] |
| 3 | [TBD] | [TBD] |
| 4 | [TBD] | [TBD] |
| 5 | [TBD] | [TBD] |
As Left Results
| Test Point | Measured Value (mL) | Remarks |
|---|---|---|
| 1 | [TBD] | [TBD] |
| 2 | [TBD] | [TBD] |
| 3 | [TBD] | [TBD] |
| 4 | [TBD] | [TBD] |
| 5 | [TBD] | [TBD] |
Measurement Uncertainty Statement: [TBD]
Statement of Conformity: [Pass/Fail overall]
Remarks: [TBD]
Signatures
Performed by: ______________________ Date: ____________
Checked by: ______________________ Date: ____________
Approved by: ______________________ Date: ____________