Vacuum Gauge (-1 to 0 bar) (CAL-0073) – Calibration Documents

Calibration Documents: Vacuum Gauge (-1 to 0 bar) (CAL-0073)

Asset ID CAL-0073
Equipment Vacuum Gauge (-1 to 0 bar)
Equipment Type Vacuum Gauge
Department Production
Area/Location Drying/Vacuum
Process Use Vacuum monitoring
Parameter Pressure
Units bar
Range Min -1
Range Max 0
Acceptance Criteria ±1%
Calibration Frequency (days) 365
Calibration Type External
Traceability ISO17025

Calibration SOP

1. Purpose

The calibration of the Vacuum Gauge (-1 to 0 bar) is performed to ensure accurate pressure measurements during the vacuum monitoring process in the Production department. This calibration controls risks associated with inaccurate pressure readings, which can impact patient safety, batch quality, and overall data integrity.

2. Scope

  • Asset ID: CAL-0073
  • Equipment Name/Type: Vacuum Gauge
  • Department/Area: Production / Drying/Vacuum
  • Process Use: Vacuum monitoring
  • Parameter: Pressure
  • Range: -1 to 0 bar
  • Units: bar
  • Calibration Frequency: 365 days

3. Definitions

  • Calibration: The process of verifying and adjusting the accuracy of a measurement instrument.
  • Verification: The confirmation that a measurement instrument meets specified requirements.
  • Adjustment: The process of modifying a measurement instrument to bring it into compliance with specified standards.
  • As Found: The condition of the instrument prior to any adjustments.
  • As Left: The condition of the instrument after adjustments have been made.
  • OOT (Out of Tolerance): A condition where the measurement falls outside the defined acceptance criteria.
  • Drift: The gradual change in a measurement instrument’s output over time.
  • Traceability: The ability to trace the measurement results back to national or international standards.
  • Measurement Uncertainty: A parameter that characterizes the range of values within which the true value is expected to lie.
  • Intermediate Check: A periodic verification of the instrument’s performance between calibrations.

4. References

  • Company Metrology SOP [TBD]
  • ISO/IEC 17025 traceability via calibration certificates
  • ALCOA+ principles

5. Responsibilities

  • Technician/Metrology: Perform calibration and maintain records.
  • QC/QA Reviewer: Review calibration results and documentation.
  • Owner Department: Ensure equipment is available and in good condition for calibration.
  • External Service Provider: Conduct external calibration as required.

6. Safety & Preconditions

  • Ensure environmental controls are in place (temperature, humidity).
  • Allow equipment to warm up and stabilize before calibration.
  • Maintain cleanliness of the equipment and surrounding area.
  • Check that the equipment is level and properly positioned.
  • Verify power supply is stable and within required specifications.
See also  Moisture Analyzer (CAL-0011) - Calibration Documents

7. Standards & Tools

  • Reference standards required: [TBD]
  • Traceability statement: ISO17025
  • Certificate validity check: [TBD]

8. Calibration Strategy

The calibration will follow the As Found and As Left logic:

  • Minimum number of points: At least 5 points, including endpoints (-1 bar, 0 bar) and midpoints.
  • Replicate readings: 3 repeats at each point as a best practice.

9. Step-by-Step Procedure

  1. Preparation: Gather all necessary tools and reference standards.
  2. Stabilization: Allow the Vacuum Gauge to stabilize in the operating environment.
  3. As Found checks and data capture: Record initial readings at defined points.
  4. Adjustment rules: If OOT, follow adjustment procedures; if not allowed, escalate to QA.
  5. As Left verification: Confirm readings post-adjustment to ensure compliance.
  6. Labeling + documentation completion: Complete all required documentation and label the equipment.

Record raw observations contemporaneously to ensure ALCOA+ compliance.

10. Acceptance Criteria & Calculations

Acceptance criteria: ±1%

Error calculation formula: Error (%) = (Observed Value – True Value) / True Value × 100

Pass/Fail logic: If error falls within ±1%, mark as pass; otherwise, mark as fail.

Rounding rule: [TBD]

11. Handling OOT / Failures

  • Immediate containment: Tag equipment and stop use.
  • Notification & deviation initiation: Inform relevant personnel of OOT condition.
  • Impact assessment trigger: Define impact window and review of affected results/batches.
  • Recalibration after repair/adjustment: Ensure recalibration is performed before returning to service.
  • QA disposition: [TBD]

12. Records & Retention

  • Logbook entries: Document all calibration activities.
  • Calibration report/certificate filing: Maintain records for audit purposes.
  • e-Records if applicable: [TBD]
  • Label content requirements: Calibrated date, due date, by whom, status.

13. Annexures

Annexure A: Calibration Data Sheet

Test Points Reference Observed Error Acceptance Pass/Fail As Found As Left
[TBD] [TBD] [TBD] [TBD] [TBD] [TBD] [TBD] [TBD]

Annexure B: Quick Checklist

  • Environmental controls verified
  • Equipment warm-up completed
  • Cleanliness confirmed
  • Leveling checked
  • Power supply stable

Annexure C: Example Label Text

Calibration Date: [TBD]

Due Date: [TBD]

Calibrated By: [TBD]

Status: [TBD]

⬆ Back to TOC


Calibration Protocol

Calibration Protocol

Protocol ID Asset ID Equipment Name Equipment Type Dept Area Process Use Parameter Units Range Acceptance Criteria Frequency Calibration Type Traceability
[TBD] CAL-0073 Vacuum Gauge (-1 to 0 bar) Vacuum Gauge Production Drying/Vacuum Vacuum monitoring Pressure bar -1 to 0 ±1% 365 days External ISO17025
See also  Reference Thermometer (Master) (CAL-0051) - Calibration Documents

Environmental Conditions

Temperature: [TBD]

Relative Humidity: [TBD]

Vibration: [TBD]

Drafts: [TBD]

Test Point Selection

  • Min: -1 bar
  • 25%: -0.75 bar
  • 50%: -0.5 bar
  • 75%: -0.25 bar
  • Max: 0 bar

Results Table

Test Point Ref Value Observed (As Found) Error Limit Pass/Fail Observed (As Left) Error Pass/Fail
-1 bar [TBD] [TBD] [TBD] ±1% [TBD] [TBD] [TBD] [TBD]
-0.75 bar [TBD] [TBD] [TBD] ±1% [TBD] [TBD] [TBD] [TBD]
-0.5 bar [TBD] [TBD] [TBD] ±1% [TBD] [TBD] [TBD] [TBD]
-0.25 bar [TBD] [TBD] [TBD] ±1% [TBD] [TBD] [TBD] [TBD]
0 bar [TBD] [TBD] [TBD] ±1% [TBD] [TBD] [TBD] [TBD]

Stepwise Instructions

  1. Preparation: Ensure the vacuum gauge is clean and properly installed in the designated area.
  2. Stabilization: Allow the equipment to stabilize for [TBD] before taking readings.
  3. Performing Readings: Take three replicate readings at each test point to ensure accuracy.
  4. Calculating Error: Calculate the error for each observed value against the reference value.
  5. Evaluation: Compare the calculated errors to the acceptance criteria of ±1%.
  6. Documentation: Record all observations and calculations in the results table.

Deviation Instruction for OOT

  • Stop use of the equipment immediately.
  • Notify the Quality Assurance (QA) department.
  • Open a deviation report.
  • Quarantine impacted results window: [TBD]
  • Await QA decision on further actions.

Approvals

Prepared Reviewed Approved
[Signature/Date] [Signature/Date] [Signature/Date]

⬆ Back to TOC


Calibration Checklist

Asset ID Equipment Dept Area Parameter Range Acceptance Frequency Traceability
CAL-0073 Vacuum Gauge (-1 to 0 bar) Production Drying/Vacuum Pressure -1 to 0 bar ±1% 365 days ISO17025

Pre-calibration

  • [ ] Verify environment conditions are within specifications
  • [ ] Allow equipment to warm up as per manufacturer guidelines
  • [ ] Clean the equipment as necessary
  • [ ] Level the equipment if applicable
  • [ ] Check validity of reference standards
  • [ ] Ensure logbook is ready for documentation

As Found Execution

  • [ ] Set the gauge to specified setpoints
  • [ ] Perform multiple repeats for accuracy
  • [ ] Record all raw data accurately
  • [ ] Perform necessary calculations for results

OOT Immediate Actions

  • [ ] Tag out the equipment if out of tolerance (OOT)
  • [ ] Stop use of the equipment immediately
  • [ ] Notify the relevant personnel
  • [ ] Document deviation details
  • [ ] Trigger impact review process
See also  FTIR Spectrometer (CAL-0111) - Calibration Documents

As Left Verification

  • [ ] Conduct post-adjustment checks
  • [ ] Confirm all results are within specified limits

Documentation & Closure

  • [ ] Update equipment label with calibration details
  • [ ] Attach calibration certificate to documentation
  • [ ] Obtain reviewer sign-off
  • [ ] Update next due date for calibration

Data Integrity (ALCOA+): Ensure all data recorded is Attributable, Legible, Contemporaneous, Original, Accurate, and Complete.

⬆ Back to TOC


Deviation Impact Assessment

Event Summary
Asset: Vacuum Gauge (-1 to 0 bar)
Date: [TBD]
Discovered By: [TBD]
Document References: [TBD]
As Found Results Summary: [TBD]

Immediate Containment Checklist

  • Stop use of the equipment
  • Label/Tag the equipment as out of service
  • Segregate impacted work

Define Impact Window

Last Known In-Tolerance Date Discovery Date
[TBD] [TBD]

Product/Batch/Test Impact Review

Batch/Study/Report ID Results Potentially Impacted Re-Test/Re-Weigh Decision
[TBD] [TBD] [TBD]

Data Integrity Review Prompts (ALCOA+)

  • Attributable: [TBD]
  • Legible: [TBD]
  • Contemporaneous: [TBD]
  • Original: [TBD]
  • Accurate: [TBD]
  • Complete: [TBD]
  • Consistent: [TBD]
  • Enduring: [TBD]
  • Available: [TBD]

Risk Assessment

Severity Probability Detectability Rationale Overall Risk
[TBD] [TBD] [TBD] [TBD] [TBD]

Investigation Summary

Investigation Summary: [TBD]

Root Cause: [TBD]

CAPA Plan

Action Owner Due Date Effectiveness Check
[TBD] [TBD] [TBD] [TBD]

QA Disposition

Release/Hold/Retest/Recall Triggers: [TBD]

⬆ Back to TOC


Calibration Certificate

Certificate No: [TBD]

Date: [TBD]

Next Due Date: [TBD]

Asset Details

Asset ID Equipment Name Equipment Type Dept Area Make/Model Serial No Location Parameter/Range/Units Acceptance Criteria
CAL-0073 Vacuum Gauge (-1 to 0 bar) Vacuum Gauge Production Drying/Vacuum [TBD] [TBD] [TBD] Pressure: -1 to 0 bar ±1%

Conditions

Environment: [TBD]

Reference Standards

Standard Name/ID Certificate No Due Date Traceability Statement
[TBD] [TBD] [TBD] Traceability to ISO17025

Results

As Found Results

Test Point Measured Value (bar) Deviation
-1.0 [TBD] [TBD]
-0.5 [TBD] [TBD]
0.0 [TBD] [TBD]
-0.75 [TBD] [TBD]
-0.25 [TBD] [TBD]

As Left Results

Test Point Measured Value (bar) Deviation
-1.0 [TBD] [TBD]
-0.5 [TBD] [TBD]
0.0 [TBD] [TBD]
-0.75 [TBD] [TBD]
-0.25 [TBD] [TBD]

Measurement Uncertainty Statement: [TBD]

Statement of Conformity: [Pass/Fail overall]

Remarks: [TBD]

Signatures

Performed by: ____________________ Date: ____________

Checked by: ______________________ Date: ____________

Approved by: _____________________ Date: ____________

⬆ Back to TOC