Capsule Filling Machine (Automatic) – IQ Protocol

Installation Qualification Protocol for Automatic Capsule Filling Machine

This document outlines the Installation Qualification (IQ) protocol for the Automatic Capsule Filling Machine utilized in the production of solid dosage forms, specifically capsules.

Document Control

Document Number: IQ-CFM-001

Version: 1.0

Effective Date: [Insert Date]

Reviewed By: [Insert Name]

Approved By: [Insert Name]

Objective

The objective of this Installation Qualification protocol is to verify that the Automatic Capsule Filling Machine is installed correctly and operates in accordance with the specified requirements outlined in the User Requirement Specification (URS) and Annex 11.

Scope

This protocol applies to the Installation Qualification of the Automatic Capsule Filling Machine located in the Production area designated for capsule manufacturing.

Responsibilities

The following personnel are responsible for the execution and approval of this protocol:

  • Validation Team: Execution of the IQ protocol.
  • Quality Assurance: Review and approval of the protocol.
  • Engineering: Installation and maintenance of the equipment.

Prerequisites

Prior to executing this protocol, the following must be completed:

  • Installation of the Automatic Capsule Filling Machine.
  • Completion of all relevant training for personnel.
  • Availability of required documentation (URS, SOPs, etc.).

Equipment Description

The Automatic Capsule Filling Machine is designed for the efficient filling of capsules with powder or granule formulations. It is equipped with PLC controls to monitor and adjust critical parameters such as fill weight, speed, and reject rates.

See also  V Blender – Traceability Matrix (URS ↔ Tests)

Test Plan

Test ID Procedure Acceptance Criteria Evidence
IQ-01 Verify installation according to manufacturer’s specifications. All components installed as per specifications. Installation checklist signed off.
IQ-02 Check electrical connections and grounding. All connections secure and compliant. Electrical inspection report.
IQ-03 Verify calibration of critical parameters. Fill weight, speed, and reject rates within specified limits. Calibration certificates.

Detailed Test Cases

Test Case: IQ-01

Objective: To ensure that the machine is installed per the manufacturer’s specifications.

Procedure: Review the installation checklist and verify each component.

Acceptance Criteria: All components must match the installation specifications.

Expected Outcome: Installation checklist signed off by validation team.

Test Case: IQ-02

Objective: To confirm electrical safety and compliance.

Procedure: Inspect electrical connections and grounding.

Acceptance Criteria: All connections must be secure and compliant.

Expected Outcome: Electrical inspection report available.

Test Case: IQ-03

Objective: To validate the calibration of critical parameters.

Procedure: Measure fill weight, speed, and reject rates.

Acceptance Criteria: Values must be within specified limits.

Expected Outcome: Calibration certificates provided.

Deviations

Any deviations from the acceptance criteria must be documented and reviewed by the Quality Assurance team. A root cause analysis will be performed to address any issues identified during the qualification process.

Approvals

This protocol must be approved by the following personnel:

  • Validation Manager: [Insert Name]
  • Quality Assurance Manager: [Insert Name]
  • Engineering Manager: [Insert Name]

Data Integrity Checks

As CSV is required, the following data integrity checks will be implemented:

  • Regular audits of data entry into the system.
  • Validation of data accuracy post-filling.
  • Automated alerts for any out-of-specification results.