Cartoning Machine – PQ Protocol

Document Control:

Document Number: PQ-CM-001

Version: 1.0

Effective Date: [Insert Date]

Reviewed By: [Insert Name]

Approval Date: [Insert Date]

Performance Qualification Protocol for Cartoning Machine

Objective: To validate the performance of the cartoning machine to ensure it meets the specified requirements for carton packing of solid dosage forms.

Scope: This protocol covers the performance qualification of the cartoning machine located in the packaging/secondary area, specifically focusing on its ability to pack cartons for solid dosage forms.

Responsibilities:

  • Validation Team: Execute the PQ protocol and document results.
  • Quality Assurance: Review and approve the PQ protocol and results.
  • Equipment Owner: Ensure the cartoning machine is maintained and operational prior to testing.

Prerequisites:

  • Completion of Installation Qualification (IQ) and Operational Qualification (OQ).
  • Availability of necessary documentation including URS Annex11.
  • Training of personnel on the cartoning machine operation.

Equipment Description:

The cartoning machine is designed for the automatic packaging of solid dosage forms into cartons. It features leaflet detection, reject logic, and an audit trail for critical processes.

Test ID Procedure Acceptance Evidence
PQ-CM-01 Verify leaflet detection functionality. Leaflet detected in 100% of cartons. Test log and screenshots of detection results.
PQ-CM-02 Audit reject logic speed. Reject speed ≤ 2 seconds. Timing records and machine logs.
PQ-CM-03 Review audit trail for completeness. Audit trail must show all operations. Audit trail printout and summary report.

Detailed Test Cases:

  • Test Case 1: Execute leaflet detection test. Record the number of cartons with detected leaflets and those without.
  • Test Case 2: Measure the time taken for the reject logic to activate upon detection of a missing leaflet.
  • Test Case 3: Generate the audit trail report and verify that all actions are logged correctly.
See also  Bag Dump Station / Sack Tip Station – Qualification Execution Checklist

Deviations: Any deviations from the acceptance criteria must be documented and investigated. A root cause analysis should be performed, and corrective actions must be implemented.

Approvals:

  • Validation Team Lead: ______________________
  • Quality Assurance: ______________________
  • Equipment Owner: ______________________

Data Integrity Checks:

  • Ensure all data entries are timestamped and user-identified in the audit trail.
  • Perform regular backups of the machine’s data logs to prevent data loss.
  • Conduct periodic reviews of the audit trail for anomalies or discrepancies.