Cartridge Stoppering Machine – OQ Protocol

Operational Qualification Protocol for the Cartridge Stoppering Machine

Document Control:

  • Document Number: OQ-001
  • Version: 1.0
  • Effective Date: [Insert Date]
  • Review Date: [Insert Date]
  • Prepared by: [Insert Name]
  • Approved by: [Insert Name]

Objective

The objective of this Operational Qualification (OQ) protocol is to verify that the Cartridge Stoppering Machine operates according to the specified requirements and is capable of consistently inserting stoppers into cartridges in compliance with regulatory standards.

Scope

This protocol applies to the Cartridge Stoppering Machine used in the production area for the insertion of stoppers into prefilled syringes and cartridges. The protocol covers all aspects of the equipment’s performance and operational integrity.

Responsibilities

  • Validation Team: Responsible for executing the OQ protocol and documenting results.
  • Quality Assurance: Responsible for reviewing and approving the protocol and results.
  • Operations: Responsible for providing access to the equipment and supporting the validation activities.

Prerequisites

  • Completion of Installation Qualification (IQ) for the Cartridge Stoppering Machine.
  • Training of personnel on the operation of the Cartridge Stoppering Machine.
  • Availability of necessary tools and materials for testing.

Equipment Description

The Cartridge Stoppering Machine is designed for the automated insertion of stoppers into cartridges. It features advanced reject logic and an audit trail for monitoring stopper placement accuracy. The equipment is classified as critical due to its direct impact on product quality.

Test Plan

Test ID Procedure Acceptance Criteria Evidence
OQ-01 Verify stopper placement accuracy 100% correct placement Audit trail logs
OQ-02 Assess reject logic functionality No false rejects Reject logic test results
See also  Bin Lifter / IBC Lifter – Equipment Validation SOP

Detailed Test Cases

Test Case OQ-01: Verify Stopper Placement Accuracy

Objective: Ensure that stoppers are placed correctly in 100% of cartridges.

Procedure: Run the machine with a specified number of cartridges and verify placement through audit trail logs.

Expected Result: All stoppers are placed correctly as per the logs.

Test Case OQ-02: Assess Reject Logic Functionality

Objective: Validate that the reject logic accurately identifies improperly placed stoppers.

Procedure: Introduce known faulty placements and confirm that the machine rejects these cartridges.

Expected Result: All faulty placements are rejected without false positives.

Deviations

Any deviations from the acceptance criteria will be documented and investigated. A root cause analysis will be performed, and corrective actions will be implemented as necessary.

Approvals

Prepared by: [Insert Name] – [Insert Date]

Approved by: [Insert Name] – [Insert Date]

Data Integrity Checks

As CSV is required, the following data integrity checks will be performed:

  • Regular backups of audit trail logs.
  • Access controls to ensure only authorized personnel can modify settings.
  • Periodic reviews of audit logs to verify compliance and identify anomalies.