Chromatography Data System (CDS) – PQ Protocol

Performance Qualification Protocol for CDS in Quality Control

Document Number: PQ-CDS-001

Version: 1.0

Effective Date: [Insert Date]

Reviewed By: [Insert Name]

Approval Date: [Insert Date]

Objective

The objective of this Performance Qualification (PQ) protocol is to validate the Chromatography Data System (CDS) used in the Quality Control (QC) lab to ensure it meets the specified requirements and operates effectively within defined parameters.

Scope

This protocol applies to the Chromatography Data System (CDS) utilized in the QC lab for managing chromatography data. It covers the validation of the software/system to ensure data integrity, user access, and compliance with regulatory standards.

Responsibilities

The following personnel are responsible for the execution and approval of this protocol:

  • Validation Team: Execute and document the PQ activities.
  • Quality Assurance: Review and approve the PQ protocol and results.
  • IT Support: Ensure the system is properly configured and maintained.

Prerequisites

Before commencing the PQ, the following prerequisites must be met:

  • Installation Qualification (IQ) must be completed.
  • Operational Qualification (OQ) must be completed.
  • All relevant user and system documentation must be available.

Equipment Description

The Chromatography Data System (CDS) is a software/system used in the QC lab to manage and analyze chromatography data. It is critical for ensuring data integrity and compliance with regulatory standards.

Detailed Test Cases

Test Case TP-001: Verify User Access Audit Trail

Steps:

  1. Log in to the CDS with admin credentials.
  2. Access the audit trail section.
  3. Review user access logs for the last 30 days.

Expected Result: All access logs should be complete and accurate.

Test Case TP-002: Check Data Integrity for Chromatography Results

Steps:

  1. Select a set of chromatography results.
  2. Attempt to modify the data without proper documentation.
  3. Check the system’s response.

Expected Result: The system should prevent unauthorized modifications and log the attempt.

Deviations

Any deviations from the acceptance criteria must be documented and reviewed. A root cause analysis should be performed to determine the impact on data integrity and compliance.

Approvals

This protocol must be approved by the following individuals:

  • Validation Manager: [Insert Name] – Date: [Insert Date]
  • Quality Assurance Manager: [Insert Name] – Date: [Insert Date]