| URS ID | URS Statement | Risk (H/M/L) | DQ Test Ref | IQ Test Ref | OQ Test Ref | PQ Test Ref | Evidence/Record | Result |
|---|---|---|---|---|---|---|---|---|
| [URS_ID_1] | The De-lumper must effectively break lumps in powder/granules to ensure uniformity. | [H/M/L] | [DQ_Test_Ref_1] | [IQ_Test_Ref_1] | [OQ_Test_Ref_1] | [PQ_Test_Ref_1] | [Evidence_Record_1] | [Result_1] |
| [URS_ID_2] | The equipment must operate within specified blade speed and torque parameters. | [H/M/L] | [DQ_Test_Ref_2] | [IQ_Test_Ref_2] | [OQ_Test_Ref_2] | [PQ_Test_Ref_2] | [Evidence_Record_2] | [Result_2] |
| [URS_ID_3] | The De-lumper must be validated for consistency in performance over multiple batches. | [H/M/L] | [DQ_Test_Ref_3] | [IQ_Test_Ref_3] | [OQ_Test_Ref_3] | [PQ_Test_Ref_3] | [Evidence_Record_3] | [Result_3] |
| [URS_ID_4] | The equipment must comply with safety and operational standards. | [H/M/L] | [DQ_Test_Ref_4] | [IQ_Test_Ref_4] | [OQ_Test_Ref_4] | [PQ_Test_Ref_4] | [Evidence_Record_4] | [Result_4] |