Depot Suspension Preparation Vessel – DQ Protocol

Document ID: DQ-001

Version: 1.0

Effective Date: 2023-10-01

Prepared By: [Your Name]

Reviewed By: [Reviewer Name]

Approval Date: [Approval Date]

Design Qualification Protocol for Depot Suspension Preparation Vessel

This document outlines the Design Qualification (DQ) protocol for the Depot Suspension Preparation Vessel used in the production of long-acting injectables.

Objective: To ensure that the Depot Suspension Preparation Vessel meets all requirements for the preparation of depot suspensions, ensuring product quality and compliance with regulatory standards.

Scope: This protocol applies to the validation of the Depot Suspension Preparation Vessel within the production area, focusing on its use for preparing depot suspensions.

Responsibilities:

  • Validation Team: Responsible for executing the DQ protocol and documenting results.
  • Quality Assurance: Responsible for reviewing and approving the DQ protocol and results.
  • Production Team: Responsible for operating the equipment during the validation process.

Prerequisites:

  • Completion of User Requirement Specification (URS).
  • Installation Qualification (IQ) of the equipment.
  • Training of personnel on equipment operation.

Equipment Description:

The Depot Suspension Preparation Vessel is designed to prepare depot suspensions with the following capabilities:

  • Agitation speed control
  • Temperature control
  • Viscosity measurement
  • Time recording
Test ID Procedure Acceptance Criteria Evidence
DQ-01 Verify agitation speed settings. Agitation speed within specified range. Calibration records, Speed measurement logs.
DQ-02 Check temperature control accuracy. Temperature maintained within ±2°C. Temperature logs, Calibration certificates.
DQ-03 Measure viscosity of prepared suspensions. Viscosity within specified limits. Viscosity test results.
DQ-04 Record preparation time. Preparation time within specified limits. Time logs.
See also  Auto Coating Pan (Perforated Pan Coater) – Equipment Validation SOP

Detailed Test Cases:

  1. Test Case DQ-01: Verify that the agitation speed can be set and maintained within the specified range. Document the set speed and the actual speed recorded.
  2. Test Case DQ-02: Measure the temperature of the preparation vessel during operation to ensure it remains within the acceptance criteria. Document temperature readings at regular intervals.
  3. Test Case DQ-03: Prepare a sample batch and measure its viscosity using a viscometer. Document the viscosity results against acceptance criteria.
  4. Test Case DQ-04: Record the total time taken for the preparation process and ensure it adheres to the specified limits. Document the start and end times.

Deviations:

Any deviations from the acceptance criteria must be documented and assessed for impact on product quality. Appropriate corrective actions must be taken and recorded.

Approvals:

Prepared by: ________________________ Date: ___________

Reviewed by: ________________________ Date: ___________

Approved by: ________________________ Date: ___________