Depot Suspension Preparation Vessel – Traceability Matrix (URS ↔ Tests)


URS ID URS Statement Risk (H/M/L) DQ Test Ref IQ Test Ref OQ Test Ref PQ Test Ref Evidence/Record Result
URS-001 Agitation speed must be maintained within specified limits. M DQ-001 IQ-001 OQ-001 PQ-001 Agitation Speed Record Pass/Fail
URS-002 Temperature must be controlled during the preparation process. H DQ-002 IQ-002 OQ-002 PQ-002 Temperature Log Pass/Fail
URS-003 Viscosity must be monitored to ensure proper formulation. M DQ-003 IQ-003 OQ-003 PQ-003 Viscosity Measurement Record Pass/Fail
URS-004 Preparation time must be recorded accurately. L DQ-004 IQ-004 OQ-004 PQ-004 Preparation Time Log Pass/Fail
URS-005 Records of all critical parameters must be maintained. M DQ-005 IQ-005 OQ-005 PQ-005 Record Keeping Log Pass/Fail
See also  Magnetic Separator (Inline) – IQ Protocol