Validation Summary Report
Equipment: Differential Pressure Monitoring System
Subcategory: Sterile (Injectables/Aseptic)
Area: Engineering
Summary
This Validation Summary Report (VSR) outlines the validation activities conducted for the Differential Pressure Monitoring System utilized in the sterile area for injectables and aseptic processes. The report summarizes the results of the Design Qualification (DQ), Installation Qualification (IQ), and Operational Qualification (OQ) phases.
Scope/Boundaries
The scope of this validation includes the DQ, IQ, and OQ of the Differential Pressure Monitoring System. The boundaries encompass the system’s installation, functionality, and performance in monitoring differential pressure within sterile processing areas.
Executed Protocol List
- DQ Protocol – Differential Pressure Monitoring System
- IQ Protocol – Differential Pressure Monitoring System
- OQ Protocol – Differential Pressure Monitoring System
Deviations Summary
No deviations were noted during the execution of the DQ, IQ, or OQ protocols. All tests were performed as per the approved protocols and met the acceptance criteria.
CPP Verification Summary
The key critical parameters verified include:
- DP range alarms
- Audit trail functionality
All critical parameters were successfully verified and found to be within the specified limits.
Conclusion
The Differential Pressure Monitoring System has been successfully validated in accordance with the URS Annex11 acceptance criteria. The system is deemed suitable for monitoring differential pressure in sterile areas, with a requalification frequency established at 12 months.
Attachments Index
- Attachment 1: DQ Protocol Report
- Attachment 2: IQ Protocol Report
- Attachment 3: OQ Protocol Report
Approvals
This report has been reviewed and approved by the following personnel:
- Validation Manager: ______________________
- Engineering Lead: ______________________
- Quality Assurance: ______________________