Dose Metering Test System (Spray Pattern / Shot Weight) – OQ Protocol

Document Control

Document Title: Operational Qualification Protocol for Dose Metering Test System

Document Number: OQ-001

Version: 1.0

Effective Date: [Insert Date]

Prepared By: [Insert Name]

Approved By: [Insert Name]

Operational Qualification Protocol for Dose Metering Test System

Objective

The objective of this Operational Qualification (OQ) protocol is to verify the Dose Metering Test System’s ability to deliver the specified dose and maintain spray characteristics as per the defined acceptance criteria.

Scope

This protocol applies to the Dose Metering Test System utilized in the Quality Control and Production areas for nasal and otic products, both sterile and non-sterile.

Responsibilities

  • Validation Team: Execute the OQ protocol and document results.
  • Quality Assurance: Review and approve the OQ protocol and results.
  • Production Personnel: Ensure the equipment is maintained and calibrated.

Prerequisites

  • Equipment must be installed and calibrated as per manufacturer’s specifications.
  • All operators must be trained on equipment usage and safety procedures.
  • Relevant SOPs must be reviewed and understood.

Equipment Description

The Dose Metering Test System is an instrument designed to measure the delivered dose and evaluate the spray characteristics of nasal and otic products. It provides critical data for ensuring product quality.

Test Plan

Test ID Procedure Acceptance Criteria Evidence
OQ-001-01 Verify dose uniformity by conducting multiple dose measurements. All measurements must fall within ±10% of the target dose. Recorded dose measurements log.
OQ-001-02 Evaluate spray geometry using calibrated imaging. Spray pattern must conform to specifications outlined in the URS Annex11. Spray pattern images and analysis report.
OQ-001-03 Audit trail verification for data integrity. All data must be logged with timestamps and user identification. Audit trail report.
See also  Cooling Tunnel / Cooling Conveyor – Qualification Execution Checklist

Detailed Test Cases

Test Case OQ-001-01: Dose Uniformity

Measure the delivered dose from the system at least 10 times. Document each measurement and calculate the mean and standard deviation. Ensure all results meet the acceptance criteria.

Test Case OQ-001-02: Spray Geometry

Use a calibrated imaging system to capture the spray pattern. Compare the captured images against the specifications in the URS Annex11. Document any deviations.

Test Case OQ-001-03: Audit Trail Verification

Access the system’s audit trail and verify that all data entries are complete with timestamps and user IDs. Document any discrepancies found during the audit.

Deviations

Any deviations from the protocol must be documented and justified. A deviation report must be submitted for review and approval.

Approvals

This document requires approval from the Validation Team and Quality Assurance before implementation.