Dropper/Tip Insertion Machine – PQ Protocol

Performance Qualification Protocol for Dropper/Tip Insertion Machine in Ophthalmics Production

Document Control:

Document Number: PQ-ED-001

Version: 1.0

Effective Date: [Insert Date]

Review Date: [Insert Date]

Objective: To validate the performance of the Dropper/Tip Insertion Machine used in the production of sterile ophthalmic products, ensuring compliance with URS Annex11 acceptance criteria.

Scope: This protocol applies to the Dropper/Tip Insertion Machine utilized in the production area for inserting dropper tips and nozzles into sterile eye drops and ointments.

Responsibilities:

  • Validation Team: Oversee the validation process and ensure compliance.
  • Quality Assurance: Review and approve the protocol and results.
  • Production Team: Execute the test plan and document results.

Prerequisites:

  • Completion of Installation Qualification (IQ).
  • Operational Qualification (OQ) completed and approved.
  • Training of personnel on equipment operation.

Equipment Description: The Dropper/Tip Insertion Machine is designed for the precise insertion of dropper tips and nozzles into vials of sterile ophthalmic products. It features automated controls for alignment, insertion force measurement, and reject logic for non-conforming products.

Test ID Procedure Acceptance Criteria Evidence
TP-01 Verify insertion force Insertion force within specified range (as per URS) Force measurement logs
TP-02 Check alignment of dropper tips All tips aligned correctly with no misalignment Visual inspection records
TP-03 Audit trail verification Complete audit trail available without gaps Audit trail report

Detailed Test Cases:

  1. Test Case ID: TC-01

    Procedure: Measure the insertion force using calibrated equipment.

    Expected Result: Insertion force falls within the specified range.

    Actual Result: [To be filled during testing]

  2. Test Case ID: TC-02

    Procedure: Perform alignment checks visually and through automated systems.

    Expected Result: All tips must be aligned correctly.

    Actual Result: [To be filled during testing]

  3. Test Case ID: TC-03

    Procedure: Review the audit trail for completeness.

    Expected Result: No gaps in the audit trail.

    Actual Result: [To be filled during testing]

See also  Depyrogenation Tunnel – PQ Protocol

Deviations: Any deviations from the acceptance criteria must be documented and reviewed by the Quality Assurance team. Proposed corrective actions should be outlined and implemented as necessary.

Approvals:

Prepared by: [Name, Title]

Reviewed by: [Name, Title]

Approved by: [Name, Title]

Data Integrity Checks:

  • Ensure all data entries are timestamped.
  • Implement user authentication for access to data logs.
  • Regular backups of all data files.