Electronic Lab Notebook / Data Capture (if used for GMP) – PQ Protocol

Document Control Number: PQ-ELN-001

Version: 1.0

Effective Date: [Insert Date]

Reviewed by: [Insert Name]

Approval Date: [Insert Date]

Performance Qualification Protocol for Electronic Lab Notebook

Objective: To validate the Electronic Lab Notebook (ELN) software for compliance with GMP requirements, ensuring data integrity and audit trail functionalities are maintained.

Scope: This protocol applies to the Electronic Lab Notebook used in R&D/QC environments for capturing electronic records impacting GMP decisions.

Responsibilities:

  • Validation Team: Overall execution and documentation of the PQ protocol.
  • Quality Assurance: Review and approval of the PQ protocol and results.
  • IT Support: Ensure system availability and address technical issues during testing.

Prerequisites:

  • Installation of the Electronic Lab Notebook software.
  • Training of personnel on the use of the ELN.
  • Completion of Installation Qualification (IQ) and Operational Qualification (OQ) protocols.

Equipment Description: The Electronic Lab Notebook is a software application used for capturing, storing, and managing laboratory data and records in compliance with GMP regulations. It provides functionalities such as audit trails, e-signatures, and access control mechanisms.

Test ID Procedure Acceptance Criteria Evidence
PQ-001 Verify audit trail functionality Audit trails must log all user actions with timestamps. Audit trail report generated.
PQ-002 Test e-signature functionality E-signatures must comply with 21 CFR Part 11 requirements. Signed entries with timestamps.
PQ-003 Check access control mechanisms Only authorized personnel should have access to the ELN. Access logs and user roles documentation.
PQ-004 Verify data retention settings Data must be retained according to company policy. Retention policy documentation.
See also  Ultracentrifuge – Qualification Certificate Template

Detailed Test Cases

Test Case: PQ-001 – Verify Audit Trail Functionality

Procedure: Log in to the ELN, perform various actions (create, edit, delete records), and generate the audit trail report.

Expected Result: All actions should be logged with accurate timestamps and user information.

Test Case: PQ-002 – Test E-Signature Functionality

Procedure: Sign a record using the e-signature feature and verify compliance with regulatory requirements.

Expected Result: The signed record should display the signature, date, and time.

Test Case: PQ-003 – Check Access Control Mechanisms

Procedure: Attempt to access the ELN with different user roles and verify access restrictions.

Expected Result: Unauthorized users should be denied access.

Test Case: PQ-004 – Verify Data Retention Settings

Procedure: Review data retention settings and ensure compliance with company policy.

Expected Result: Data retention settings should align with the documented policy.

Deviations

Any deviations from the acceptance criteria must be documented and investigated. A root cause analysis should be performed, and corrective actions should be implemented.

Approvals

Prepared by: ____________________ Date: _____________

Reviewed by: ____________________ Date: _____________

Approved by: ____________________ Date: _____________