Extrusion Machine – PQ Protocol

Performance Qualification Protocol for Extrusion Machine Used in Implant Production

Document Control:

Document Number: PQ-EM-001

Revision Number: 1.0

Effective Date: [Insert Date]

Prepared By: [Insert Name]

Approved By: [Insert Name]

Objective

The objective of this Performance Qualification (PQ) protocol is to validate the Extrusion Machine used for the production of Drug-Eluting and Biodegradable Implants, ensuring it operates within specified parameters and meets acceptance criteria outlined in the User Requirement Specification (URS) Annex 11.

Scope

This protocol applies to the Extrusion Machine located in the Production area, designated for extruding implant materials with a direct impact on product quality.

Responsibilities

  • Validation Team: Responsible for executing the PQ protocol and documenting results.
  • Quality Assurance: Responsible for reviewing and approving the protocol and results.
  • Production Personnel: Responsible for operating the Extrusion Machine as per the validated procedures.

Prerequisites

  • Completion of Installation Qualification (IQ) and Operational Qualification (OQ).
  • Training of personnel on the operation of the Extrusion Machine.
  • Availability of all necessary materials and equipment for testing.

Equipment Description

The Extrusion Machine is designed to extrude implant materials with precise control over critical parameters including temperature, pressure, and speed. It features an audit trail log for data integrity and traceability.

Test Plan

Test ID Procedure Acceptance Criteria Evidence
PQ-01 Measure Extrusion Temperature Temperature within specified range (e.g., 180-220°C) Temperature log and calibration certificate
PQ-02 Measure Extrusion Pressure Pressure within specified range (e.g., 100-150 psi) Pressure log and calibration certificate
PQ-03 Measure Extrusion Speed Speed within specified range (e.g., 10-50 mm/min) Speed log and calibration certificate
PQ-04 Review Audit Trail Logs No discrepancies found Audit trail log report
See also  Ophthalmic Sterile Filtration Skid (0.22 µm) – DQ Protocol

Detailed Test Cases

Test Case PQ-01: Measure Extrusion Temperature

Procedure: Set the Extrusion Machine to the specified temperature range. Allow the machine to stabilize and record the temperature readings.

Acceptance Criteria: Temperature must remain within the specified range of 180-220°C.

Evidence: Provide temperature logs and calibration certificates for the temperature sensor.

Test Case PQ-02: Measure Extrusion Pressure

Procedure: Set the Extrusion Machine to the specified pressure range. Allow the machine to stabilize and record the pressure readings.

Acceptance Criteria: Pressure must remain within the specified range of 100-150 psi.

Evidence: Provide pressure logs and calibration certificates for the pressure gauge.

Test Case PQ-03: Measure Extrusion Speed

Procedure: Set the Extrusion Machine to the specified speed range. Allow the machine to stabilize and record the speed readings.

Acceptance Criteria: Speed must remain within the specified range of 10-50 mm/min.

Evidence: Provide speed logs and calibration certificates for the speed controller.

Test Case PQ-04: Review Audit Trail Logs

Procedure: Review the audit trail logs generated by the Extrusion Machine during operation.

Acceptance Criteria: No discrepancies or unauthorized changes found in the logs.

Evidence: Provide the audit trail log report for review.

Deviations

Any deviations from the acceptance criteria must be documented and assessed for impact on product quality. A corrective action plan must be developed and implemented as necessary.

Approvals

Prepared By: [Insert Name]   Date: [Insert Date]

Approved By: [Insert Name]   Date: [Insert Date]